To ensure that the quality of Finished Product as per BIS standards by planning Checking and monitoring the quality of Raw Material & in Process material in order to achieve targeted objectives. To ensure that to fulfill all requirement related to Environment as per
GPCB and implement the QMS-IMS systems
UltraTech Cement Limited Unit: Narmada Cement Magdalla Works is a Grinding Unit of UltrTech Cement Limited manufacturing is done at our Magdalla Plant by using clinker (semi-finish material).
The Magdalla Grinding Unit has been commissioned in the year 1982. The plant capacity per annum is 0.7 Million Tonnes. Our Magdalla plant is situated 16 KM from Surat railway station in municipal area. Clinker brought through the Ships is unloaded by grab bucket type un loader of 300 TPH capacity installed on Tapti river Jetty at are producing two types of cement namely OPC 53 and PPC. Electronic Packers of capacity of 90 TPH.
Major challenges
To obtain the Compressive strength of cement as specified internally within the specified range of Blaine of cement.
1. Supervise monitor and control the quality of all receipt raw materials and finish products as per quality plan.
2. Implement IMS & WCM related activities through involvement of team members in the section.
3. Inventory Control of Raw Materials.
4. Monitoring of DPR & Other Reports as & when required.
5. Optimisation of Production Cost.
6. Compliance of all requirements as per BIS & GPCB Norms.
7. CSI Sustainability data Reporting
8. Co- ordination with Marketing Dept. for Customer satisfaction & Feedback.
| KRA (Accountabilities) (Max 1325 Characters) | Supporting Actions (Max 1325 Characters) | |
|---|---|---|
| KRA1 | Accountability 1. Supervise monitor and control the quality parameter. | *Monitoring quality control of receipt raw materials & finished product as per quality plan. *Checking quality parameters. |
| KRA2 | 2. Inventory Control of Raw Materials. | *Monitoring of receipt & consumption of raw materials. |
| KRA3 | 3. Compliance of all requirements as per BIS & GPCB Norms. | *Timely Completion of all requirements of BIS & GPCB Norms. |
| KRA4 | Management: | *Training to subordinates. *Training for IMS & QMS systems. *Performance management. *Skill Gap identification. |
| KRA5 | 5. System Improvement. Coordinate organize & monitor effective implementation of ISO/OHSAS/14000 & WCM systems in the section for improvement of productivity and work area. | *Identify and execute improvement study and kaizen. *Identify & get rectified. -Abnormalities. -Spillage/leakages. -Unsafe conditions/practices. 5S activities. -Points emerged in campaigns. *Execute implementation plan for |
| KRA6 | 6. Cost Control Optimizetion of Production Cost. | a. Usage of Cheapest Gypsum and b. Increasing the Fly Ash Consumption without compromising Quality Parameter. |
| KRA7 | & Environment: Review & monitor work practices to achieve dust free & safe working environment. | * Daily Safety Talk. *Safety Observation as per Target * Work as a Auditor for FPSA & CFSA * Monitoring of Stack emission & AAQM |
| KRA8 | 8. CSI Sustainability | Work as coordinator for CSI Sustainability data Reporting |
Required Experience:
Manager
Discover a world of financial solutions at Aditya Birla Capital – your trusted partner for investments, insurance, loans, and a wide range of financial services in India.