Padink Engineering

دوام كامل

Lead Design & 3D Modeling:Spearhead complex 3D plant modeling using AVEVA E3D for large-scale metals and mining projects (e.g. concentrator plants crushing/grinding areas hydrometallurgical plants tailings disposal systems and slurry pumping stations).Develop optimal plot plans equipm

Lead Design & 3D Modeling:Spearhead complex 3D plant modeling using AVEVA E3D for large-scale metals and mining projects (e.g. concentrator plants crushing/grinding areas hydrometallurgical plants tailings disposal systems and slurry pumping stations).Develop optimal plot plans equipm

قدم الآن
دوام كامل

3D Modeling & Layout Design:Develop intelligent 3D piping models using AutoCAD Plant 3D for various mineral processing units (e.g. crushing/grinding flotation thickeners tailings disposal slurry handling and water treatment systems).Design equipment layouts plot plans and routing conf

3D Modeling & Layout Design:Develop intelligent 3D piping models using AutoCAD Plant 3D for various mineral processing units (e.g. crushing/grinding flotation thickeners tailings disposal slurry handling and water treatment systems).Design equipment layouts plot plans and routing conf

قدم الآن

Padink Engineering

دوام كامل

TYPICAL ROLES AND RESPONSIBILITIES:Design & Engineering of Equipment in Hydrometallurgy Smelting SAP & GC Metals &Minerals area.Preparation of Equipment 3D Models and Detail Drawings with BOMShould be able to understand the scope of work technical requirements/specifications Project d

TYPICAL ROLES AND RESPONSIBILITIES:Design & Engineering of Equipment in Hydrometallurgy Smelting SAP & GC Metals &Minerals area.Preparation of Equipment 3D Models and Detail Drawings with BOMShould be able to understand the scope of work technical requirements/specifications Project d

قدم الآن

Padink Engineering

دوام كامل

Lead design engineering and execution of HVAC systems for Oil & Gas Green Hydrogen Compressed Biogas and chemical process projects Perform end-to-end HVAC design for process buildings control rooms substations and utilityareas Carry out heat load calculations equipment sizing duct an

Lead design engineering and execution of HVAC systems for Oil & Gas Green Hydrogen Compressed Biogas and chemical process projects Perform end-to-end HVAC design for process buildings control rooms substations and utilityareas Carry out heat load calculations equipment sizing duct an

قدم الآن

Padink Engineering

دوام كامل

The Proposal Engineer will be responsible for preparing technical proposals for power generation and industrial utility projects. The incumbent will coordinate with engineeringprocurement project management and commercial teams to develop competitive proposalsin response to client inq

The Proposal Engineer will be responsible for preparing technical proposals for power generation and industrial utility projects. The incumbent will coordinate with engineeringprocurement project management and commercial teams to develop competitive proposalsin response to client inq

قدم الآن

Padink Engineering

دوام كامل

Structural analysis and design of industrial steel structures such as pipe racks equipment structures platforms and residential and commercial building structures. Proficient in structural modeling and analysis using . Experienced in steel design and RCC foundations design as per Amer

Structural analysis and design of industrial steel structures such as pipe racks equipment structures platforms and residential and commercial building structures. Proficient in structural modeling and analysis using . Experienced in steel design and RCC foundations design as per Amer

قدم الآن
دوام كامل

Principal Duties & Key Responsibilities. Static Equipment Engineer determine and develop the most suitable economically and working on technically complex Static equipments design within proposals studies projects execution as part of a study or project team in accordance with design

Principal Duties & Key Responsibilities. Static Equipment Engineer determine and develop the most suitable economically and working on technically complex Static equipments design within proposals studies projects execution as part of a study or project team in accordance with design

قدم الآن
دوام كامل

Knowledge of LV and HV equipment specifications like HV/LV switchgear transformers MCC etc and review/approval of vendor documents. Proficient in Calculations like transformer sizing cable sizing lighting design and Single Line Diagrams. Preparation of various schedules like Load S

Knowledge of LV and HV equipment specifications like HV/LV switchgear transformers MCC etc and review/approval of vendor documents. Proficient in Calculations like transformer sizing cable sizing lighting design and Single Line Diagrams. Preparation of various schedules like Load S

قدم الآن

Padink Engineering

دوام كامل

Reinforced concrete structure and steel structures Analysis & design using STAAD Pro. Software. Design of foundation including pile foundation and machine foundations Structural steel connection design. Knowledge of Indian and American codes & standards. Ductile detailing as per

Reinforced concrete structure and steel structures Analysis & design using STAAD Pro. Software. Design of foundation including pile foundation and machine foundations Structural steel connection design. Knowledge of Indian and American codes & standards. Ductile detailing as per

قدم الآن
دوام كامل

Lead and execute detailed engineering for cooling water systems including both open and closed loop configurations. Design and engineering of Condenser cooling water system Cooling towers andassociated piping systems. Design and engineering of Raw water Systems Sea water intake syste

Lead and execute detailed engineering for cooling water systems including both open and closed loop configurations. Design and engineering of Condenser cooling water system Cooling towers andassociated piping systems. Design and engineering of Raw water Systems Sea water intake syste

قدم الآن

Padink Engineering

دوام كامل

Preparation of Plot plan Preparation of equipment layout for Gas turbine area Steam turbine area Fuel gas area andCooling water pump Preparation of P&ID for all system like Steam feedwater condensate AutoCAD Review of Vendor drawing and updation of equipment layout Coordination w

Preparation of Plot plan Preparation of equipment layout for Gas turbine area Steam turbine area Fuel gas area andCooling water pump Preparation of P&ID for all system like Steam feedwater condensate AutoCAD Review of Vendor drawing and updation of equipment layout Coordination w

قدم الآن

Padink Engineering

دوام كامل

The HVAC Designer is responsible for developing comprehensive designs and detailed layouts for heating ventilation and air conditioning systems in power plants and other industrial projects. Therole requires strong expertise in chilled water systems VRF systems and various other HVACc

The HVAC Designer is responsible for developing comprehensive designs and detailed layouts for heating ventilation and air conditioning systems in power plants and other industrial projects. Therole requires strong expertise in chilled water systems VRF systems and various other HVACc

قدم الآن