Employer Active
Job Alert
You will be updated with latest job alerts via emailJob Alert
You will be updated with latest job alerts via emailVehicle scheduling using OTD suite of application (OPTESSA) is managed centrally for all IMG Plants. This
position (Scheduling Engineer) is required to develop a buildable vehicle schedule using the OTD suite of
applications (OPTESSA) for all IMG manufacturing locations
1. Prepare for loading Schedule based on Forecast Real order rendition and OP Plan to Plan
2. Consider parameters such as Manufacturing capacity supplier capacity vessel timelines Aging and
Market priorities (if any) while loading the Schedule
3. Scheduling is completed in weekly slices post which the constraints need be analyzed and
communicated to the relevant teams (in line with point#5)
4. Ensure levelling actions are completed on time and weekly slices are converted to a day wise plan
5. Liaise with Sales team for market allocation capacity constraints team / SCM for material availability
Vehicle logistic team for Export vessel shipment plan and manufacturing team for plant constraints to
achieve and maintain a buildable order layout.
6. VIN generation will follow the normal sequential flow and consecutive build dates are locked
7. Sequencing is completed using OVS/ Optessa and the output is verified with the Plant team
8. Sequence file is then sent to NGAVS
9. Apart from these actions Scheduler is also responsible for working with OFM and Central Al
Education Qualification : B.E / .
Number of Years of Experience : 4 to 6 years
Professional Exposure : Exposure in Production scheduling / Forecasting / Facility Capacity Planning section in Manufacturing / Engineering Industry.
Any other requirement:
Strong written and verbal English capabilities.
Strong interpersonal skills to interact effectively with Sales SCM/ Constraints team Vehicle logistics and Manufacturing.
Good analytical capabilities.
Proficient in PC-based software (Microsoft Excel Word PowerPoint Project etc.)
Required Experience:
IC
Full-Time