Fatah BERRIM

Fatah BERRIM

Site Engineer
Qatar
English, Arabic, Spanish, French

نبذة عني

Multidisciplinary engineering professional with 18+ years of experience in pipeline, process, and mechanical services within the oil & gas industry, specializing in EPC projects, LNG facilities, pre-commissioning, commis…

الخبرة

Site Engineer Steam Blowing

Halliburton / QatarEnergy / CTJV NFE EPC 1 LNG projects
Jan 2026 - حتى الآن · 6 أشهر

Executed steam blowing and commissioning activities across multiple utility and process systems, including PR-60 and PR-65 low-pressure (LS) lines.
Handled steam blowing for Boiler Feed Water (BFW) systems, boilers, and 75PR steam networks to achieve required cleanliness standards.
Conducted blowing and line preparation for air and nitrogen systems across Trains 8–9 and 10–11.
Supervised activities related to Gas Turbine Generators (GTG) and Combined Turbine Generators (CTG-01, CTG-02, CTG-03) during pre-commissioning and steam blowing phases.
Managed steam blowing in strainer/filter systems and deaerator areas to ensure debris-free operation prior to startup.
Performed monitoring of letdown stations to control pressure reduction and ensure system safety during high-energy operations.
Executed blowdown operations in critical areas, maintaining strict adherence to operational and HSE requirements.
Worked on High-High Pressure Steam (HHS), Low Pressure Steam (LS), and Low Pressure (LP) utility systems during steam blowing and commissioning activities.

Project Manager | Engineer – Lube Oil Flushing & Retro Jetting, Chemical Cleaning

Groupment Sonatrach & ENI
Jan 2025 - Jan 2025 · 29 أيام

Led and coordinated all engineering and cleaning operations for the Turbine Exhaust Gas Cooler / Waste Heat Recovery Unit (WHRU), ensuring full compliance with safety, environmental, and quality standards.
Managed project execution, including scheduling, resource allocation, contractor oversight, and technical supervision for all on-site cleaning and maintenance activities.
Oversaw Retro Jetting operations to remove internal fouling and deposits, effectively restoring and enhancing heat exchanger thermal performance.
Directed Chemical Cleaning procedures to eliminate corrosion products, scale, and contaminants from WHRU and associated tubing systems.
Supervised Lube Oil Flushing operations, ensuring lubrication system cleanliness and reliability through controlled flushing and monitoring of contamination levels.
Prepared detailed procedures, work instructions, and risk assessments, including the use of an air dryer system after jetting operations.
Achieved the required oil cleanliness level of NAS 8, verifying compliance through particle count testing and documentation.

Project Manager | Engineer – Lube Oil Flushing & Retro Jetting, Chemical Cleaning

Groupment Sonatrach & ENI, BRN, Algeria
Jan 2025 - Jan 2025 · 29 أيام

Led and coordinated all engineering and cleaning operations for the Turbine Exhaust Gas Cooler / Waste Heat Recovery Unit (WHRU), Managed project execution, scheduling, resource allocation, and technical supervision, Oversaw Retro Jetting operations, Chemical Cleaning procedures, and Lube Oil Flushing operations, Prepared detailed procedures, work instructions, and risk assessments, Achieved the required oil cleanliness level of NAS 8

Operations Engineer

Enerpac Group
Nov 2020 - Dec 2024 · 4 سنوات 1 شهر

Prepared comprehensive work packs for pipeline inspection operations, including technical documentation and execution plans, delivered to ROSEN for advanced ILI tool deployment and inspection coordination.
Managed pipeline questionnaires for In-Line Inspection (ILI) operations.
Planned and coordinated ILI programs, including detailed cleaning and gauging operations to ensure pipeline readiness and optimal tool performance.
Oversaw ILI pigging processes and documentation of all procedures.
Compiled preliminary and final reports, including detailed anomaly listings.
Planned and executed corrosion repairs, checklist management, and sandblasting procedures.
Conducted holiday tests, WFT pit gauge checks, and progress monitoring of ILI and corrosion repair projects.

Operations Engineer Pipeline Corrosion Inspection Engineer Organic Position OXY ILI Pigging

Enerpac Group, Algeria
Nov 2020 - Dec 2024 · 4 سنوات 1 شهر

Prepared comprehensive work packs for pipeline inspection operations, Managed pipeline questionnaires for In-Line Inspection (ILI) operations, Planned and coordinated ILI programs, including detailed cleaning and gauging operations, Oversight of ILI pigging processes and documentation, Conducted holiday tests, WFT pit gauge checks, and progress monitoring of ILI and corrosion repair projects

Flange Management Engineer

Hydratight Ltd
Jan 2017 - Jan 2019 · 2 سنوات

Designation: Flange Manager
Worked on GB ELM Train 4 Shutdown Year 2017.
Worked on GB ELM Train 1 Shutdown 20218.
Worked on GB ELM Train 1 Shutdown 2019.
Department: Maintenance & General Services & Planning.

Pre Commissioning & Commissioning Supervisor – GRN Project

Repsol & Sonatrach – Adrar, Algeria GRN
Jan 2019

Supervised and coordinated mechanical installation, pre-commissioning, and commissioning activities for pipelines, pressure vessels, and process systems.
Led pre-commissioning tasks including flushing, hydrotesting, leak testing, torque verification, and system alignment to ensure operational readiness.
Managed inspection and quality verification, ensuring all mechanical work met EPC project specifications, client standards, and regulatory requirements.
Coordinated multidisciplinary teams, including engineers, construction crews, and commissioning technicians, to achieve schedule targets and safe execution.
Oversaw documentation and reporting, including commissioning checklists, test results, and handover records for client approval.
Ensured strict compliance with HSE policies, PTW systems, and safe work practices throughout all mechanical and commissioning operations.
Supported troubleshooting, start-up checks, and operational readiness of static and rotating equipment, optimizing system performance during commissioning.

Flange Management Engineer Organic Position Sonatrach & OXY GB

Hydratight Ltd, Algeria
Jan 2017 - Jan 2019 · 2 سنوات

Supervised all aspects of pipeline pigging, chemical cleaning, and Oil Flushing, N2 Leak test using Membrane Unit & Liquid N2 Pump, Air blowing, Hydrotest, Retro jetting, N2 purging

Pre Commissioning & Commissioning Supervisor – GRN Project Mechanical Support / Pre Commissioning & Commissioning Supervisor – GRN Project

Repsol & Sonatrach – Adrar, Algeria GRN, Adrar, Algeria
Jan 2019

Supervised and coordinated mechanical installation, pre-commissioning, and commissioning activities, Led pre-commissioning tasks including flushing, hydrotesting, leak testing, torque verification, Managed inspection and quality verification, Coordinated multidisciplinary teams, Ensured strict compliance with HSE policies

Pre-Commissioning & Commissioning Foreman – Pressure Systems

HMN ISG Gas BP Project
Apr 2016 - Apr 2018 · 1 سنة 11 أشهر

Supervised all pre-commissioning and commissioning activities for pressure systems, including piping, pressure vessels, WHRU equipment, and auxiliary systems.
Led hydrotesting and pneumatic testing operations, ensuring correct pressurization sequences, stabilization periods, and safe depressurization in compliance with BP project standards.
Directed flushing, chemical cleaning, retro jetting, air blowing, nitrogen purging, and leak testing to verify system cleanliness and operational readiness.
Conducted system walk-downs and punch-list management, ensuring mechanical completion of piping, valves, supports, and instrumentation prior to testing.
Oversaw installation of test blinds, spades, gauges, manifolds, and isolation devices, managing field teams and ensuring safety compliance.
Prepared and reviewed test packs, method statements, and risk assessments for all high-pressure activities.
Coordinated with QA/QC teams to verify weld acceptance, NDE results, pressure test documentation, and reinstatement of systems after testing.
Ensured all work followed BP HSE standards, delivering toolbox talks, enforcing the Permit to Work (PTW) system, and maintaining safe execution of high-pressure tasks.
Monitored cleanliness results following cleaning operations, including use of air drying equipment, ensuring required cleanliness standards were achieved (NAS 8).
Verified system dryness by monitoring dew point levels after air drying, confirming readiness for commissioning.

Pre-Commissioning & Commissioning Foreman – Pressure Systems

HMN ISG Gas BP Project, IN Salah
Apr 2016 - Apr 2018 · 1 سنة 11 أشهر

Supervised all pre-commissioning and commissioning activities for pressure systems, Led hydrotesting and pneumatic testing operations, Directed flushing, chemical cleaning, retro jetting, air blowing, nitrogen purging, leak testing, Conducted system walk-downs and punch-list management, Oversaw installation of test blinds, spades, gauges, manifolds

N2 Leak test Supervisor & Flange Manager & Process Supervisor

Hydratight Ltd
Jan 2015 - Jan 2017 · 2 سنوات

Supervised all aspects of pipeline pigging, chemical cleaning, and Oil Flushing.
Performed N2 Leak test using Membrane Unit & Liquid N2 Pump, Air blowing, Hydrotest, Retro jetting, and N2 purging.

Project Supervisor Nitrogen Leak Test & Process Supervisor

Fourquest Energy
Feb 2015 - Feb 2016 · 1 سنة

Performed Nitrogen & helium leak testing using Liquid N₂ Pump Converter to pressurize systems and conducted HD1 Ultrasonic Leak Detection to verify system tightness and identify potential leak points.
Responsible for the preparation of test packs, including compilation of all required documentation (P&IDs, isometrics, test procedures, test limits, and system boundaries) in accordance with project specifications and QA/QC standards.
Reviewed and marked up P&IDs to define test limits, identify test headers, isolation points, vents, drains, and instrumentation as part of pre-test planning and system handover.
Coordinated with construction, QA/QC, and commissioning teams to ensure system readiness prior to leak testing, including mechanical completion and punch list clearance ensuring alignment with project schedules, safety procedures, and engineering standards.
Ensured all leak testing activities were performed in compliance with safety protocols, permit-to-work systems, and site-specific risk assessments.

Project Supervisor Nitrogen Leak Test & Process Supervisor

Fourquest Energy, IN Aminas, Algeria
Feb 2015 - Feb 2016 · 1 سنة

Performed Nitrogen & helium leak testing, Preparation of test packs, Coordinated with construction, QA/QC, and commissioning teams, Ensured all leak testing activities were performed in compliance with safety protocols

Offsite Shutdown Pipeline (ROW) Supervisor Pigging Ops & Flange Management

Fourquest Energy and Anadarko GB HBNS Sonatrach Organic Position
Jan 2015 - Feb 2015 · 30 أيام

Coordinated and supervised shutdown activities at offsite pipeline (ROW), pig launcher and receiver stations, and well site junction facilities, ensuring safe and efficient execution of all operations.
Prepared, isolated, and depressurized pipelines, pig traps, and well site tie-in points in accordance with shutdown procedures.
Performed hydrotesting and N2 Leak Test of pipeline sections following maintenance, verifying integrity and compliance with project specifications.
Managed pig launcher and pig receiver operations, including loading, monitoring pig travel, receiving, and ensuring system readiness post-pigging.
Conducted dewatering and purging drying pigging using nitrogen and water, confirming dryness through dew point checks before re-pressurizing pipelines.
Performed flange management, bolting, and torquing activities on FGS points, tie-ins, and well site junctions in line with pipeline integrity requirements.
Performed leak testing and verification of sealing integrity prior to recommissioning of pipeline systems.
Supervised and coordinated teams from multiple subcontractors (mechanical, pigging, hydrotest, inspection, and operations crews) to ensure seamless execution of shutdown works and activity sequencing.
Collaborated with inspection and QA/QC teams to review hydrotest records, bolting documentation, pigging reports, and pipeline reinstatement packages.
Directed logistics planning, ensuring proper deployment of manpower, pigging tools, test equipment, nitrogen units, water pumps, and support materials during shutdown and start-up operations.
Ensured strict compliance with HSE policies, PTW systems, and LOTO procedures, conducting daily toolbox talks, risk assessments, and coordination meetings to maintain safe working conditions.
Maintained comprehensive shutdown documentation, including pigging logs, hydrotest data, flange torque records, depressurization/pressurization reports, and final reinstatement dossiers for client approval.

Offsite Shutdown Pipeline (ROW) Supervisor Pigging Ops & Flange Management

Fourquest Energy and Anadarko GB HBNS Sonatrach Organic Position, HBNS, Algeria
Jan 2015 - Feb 2015 · 30 أيام

Coordinated and supervised shutdown activities at offsite pipeline (ROW), Managed and executed critical pipeline field operations, Flange management, bolting, and torquing activities, Leak testing and verification of sealing integrity

Mechanical Technician

Groupment Berkine sonatrach & OXY
Oct 2013 - Dec 2014 · 1 سنة 2 أشهر

Designation: Mechanical Technician
Worked on HBNS GB OXY Train 3 Shutdown.
Worked on HBNS GB OXY Train 1 & 2 Shutdown.
Department: Maintenance & General Services Centre (HBNS BERKINE HMD).

Mechanical Technician

Groupment Berkine Sonatrach & OXY, BERKINE HMD, Algeria
Oct 2013 - Dec 2014 · 1 سنة 2 أشهر

Engaged in civil, mechanical, and piping works for industrial projects, Participated in equipment installation, testing, and commissioning, Assisted in equipment installation, testing, and commissioning, Coordinated with multidisciplinary teams

Bolting Supervisor / Leak Test Supervisor

Miskar Platform – BG / Shell, Offshore Tunisia / Weatherford GMBH SD
Sep 2013 - Oct 2013 · 1 شهر

Supervised controlled bolting, torqueing, and tensioning operations on flanged joints and critical connections during the scheduled shutdown.
Ensured correct gasket selection, flange alignment, bolt lubrication, and adherence to BG/Shell standards.
Managed hydraulic torque and tensioning tools for high-integrity joint assembly.
Verified flange management records (FMEs) and assured leak-free completion.
Planned and coordinated leak testing for process and utility systems across the Miskar offshore platform.
Oversaw system isolation, pressurization (air/nitrogen/water), and pressure hold checks.
Identified leaks, guided corrective actions, and ensured closure of all punch-list items.
Worked closely with QA/QC, mechanical, and operations teams to certify systems for commissioning.

Bolting Supervisor / Leak Test Supervisor

Miskar Platform – BG / Shell, Offshore Tunisia / Weatherford GMBH SD, Gulf of Gabes, Tunisia
Sep 2013 - Oct 2013 · 1 شهر

Supervised controlled bolting, torqueing, and tensioning operations, Planned and coordinated leak testing for process and utility systems, Oversaw system isolation, pressurization, and pressure hold checks, Worked closely with QA/QC, mechanical, and operations teams

Pre-Commissioning Process Supervisor / Weatherford

Saipem Arzew LNG Train (GL3Z)
Jan 2012 - Dec 2012 · 11 أشهر

Managed steam blowing activities for critical process and utility lines to achieve required cleanliness and system acceptance criteria.
Supervised air blowing operations, ensuring proper pressurization, blow-down sequencing, and pipeline readiness.
Directed leak testing on process, utility, and high-pressure systems.
Planned test packs, monitored pressurization, and validated joint integrity.
Coordinated with QA/QC and discipline teams to close punch items and certify systems for commissioning.
Oversaw controlled bolting, torqueing, and tensioning on flanged joints, ensuring compliance with Saipem standards and gasket installation procedures.
Supervised oil flushing of rotating equipment systems, ensuring proper flow rates, cleanliness levels, and equipment protection.
Managed high-pressure jetting operations for pipes, equipment, and process lines prior to pre-commissioning.
Directed system drying activities (air, nitrogen, and desiccant drying) to meet required moisture content before handover.

Pre-Commissioning Process Supervisor / Weatherford

Saipem Arzew LNG Train (GL3Z), Oran, Algeria
Jan 2012 - Dec 2012 · 11 أشهر

Managed steam blowing activities for critical process and utility lines, Supervised air blowing operations, Directed leak testing on process, utility, and high-pressure systems, Oversaw controlled bolting, torqueing, and tensioning on flanged joints

PCC Supervisor

Saipem MLE project EPC Project
Dec 2010 - Nov 2011 · 11 أشهر

Execute pre-commissioning activities such as air blowing, N2 purging, drying, chemical cleaning, lube oil flushing, retro jetting, leak testing, and system cleaning.
Perform commissioning checks, equipment functional tests, mechanical run tests, and system readiness verification.
Review and prepare test packs, P&IDs, isometrics, and pre-commissioning dossiers.
Coordinate with operations, mechanical, process, electrical, instrumentation, QA/QC, and HSE teams to ensure proper system handover.
Implement punch list generation, categorization, and closure (A/B punch items).
Conduct pressure tests, vacuum tests, valve tests, line checks, and reinstatement activities.
Supervise mechanical technicians and contractors during PCC activities.
Ensure all works follow EPC specifications, commissioning procedures, method statements, and safety guidelines.
Assist in system walk-downs, equipment inspection, alignment checks, and pre-start requirements.
Participate in client / operator acceptance and documentation handover.

PCC Supervisor

Saipem MLE project EPC Project, MLE, Algeria
Dec 2010 - Nov 2011 · 11 أشهر

Executed pre-commissioning activities such as air blowing, N2 purging, drying, chemical cleaning, Performed commissioning checks, equipment functional tests, mechanical run tests, Coordinated with operations, mechanical, process, electrical, instrumentation, QA/QC, and HSE teams, Implemented punch list generation, categorization, and closure

Supervisor, Pipeline & Process Senior Technician & N2 Membrane & LN2 Pump

Weatherford GMBH
Apr 2010 - Nov 2010 · 7 أشهر

Pipeline Pigging & Cleaning Maintenances and ILI Supervisor SP5/SP6.
N2 Leak test using Membrane Unit & Liquid N2 Pump, Oil Flushing, Pigging, Dewatering, Chemical cleaning, Bolting, Air blowing, Hydro test, Retro jetting, N2 purging, Inspection Borescope camera.

Supervisor, Pipeline & Process Senior Technician & N2 Membrane & LN2 Pump

Weatherford GMBH, Hassi Masoud, Algeria
Apr 2010 - Nov 2010 · 7 أشهر

Performed Tubular Running Services (TRS) operations, Operated and maintained TRS equipment, Supervised and trained junior technicians, Ensured tubular quality through torque verification, drift checks, thread inspection

Mechanical Technician (Support Technician)

BP & Statoil JV
Jan 2010 - Mar 2010 · 1 شهر

Supported mechanical maintenance activities on rotary equipment.
Assisted in cleaning heat exchangers and performing hydro tests.
Conducted leak testing and retro jetting as part of shutdown operations.
Provided technical support to ensure smooth execution of maintenance tasks.

Pre-Commissioning & Commissioning Engineer / Sr Operator Weatherford GMBH

MEDGAZ – (EPC Project) CEPSA (Spain) Iberdrola (Spain) Endesa (Spain) Gaz de France
Jan 2009 - Dec 2009 · 10 أشهر

Executed pre-commissioning and commissioning activities for pipelines and process systems.
Performed air blowing, explosive venting, purging, drying, and chemical cleaning of pipelines.
Carried out oil flushing, retro jetting operations, and bolting to ensure mechanical integrity.
Conducted pipeline leak testing and verified system performance.
Coordinated with operations, safety, and QA/QC teams to ensure compliance with EPC project standards.
Supervised pre-commissioning procedures according to project schedules and client requirements.

TRS Sr Technician

Weatherford GMBH
Mar 2008 - Apr 2009 · 1 سنة 1 شهر

Performed Tubular Running Services (TRS) operations, including casing and tubing running, and completion equipment installation.
Operated and maintained TRS equipment like power tongs, CRT, torque turn systems, hydraulic catwalks, and elevators.
Conducted make-up/break-out operations using torque monitoring systems for connection integrity.
Supervised and trained junior technicians on Rigs 222 and 228.
Ensured tubular quality through torque verification, drift checks, thread inspection, and cleaning.
Coordinated with the Drilling Supervisor and crew for safe and efficient operations.
Managed rig-up/rig-down per Weatherford and client standards.
Performed preventive maintenance and troubleshooting on TRS tools.
Enforced HSE procedures, conducted toolbox talks, and ensured safe practices.
Prepared checklists, torque reports, and activity logs for documentation.

Technician

Sonatrach (GCB)
Jan 2005 - Jan 2007 · 2 سنوات

Engaged in civil, mechanical, and piping works for industrial projects, including drilling platform setups, pipeline installation, and facility construction.
Participated in canalization, alignment, and site preparation to support large-scale oil and gas projects.
Assisted in equipment installation, testing, and commissioning for process plants, oil treatment centers, and support infrastructure.
Coordinated with multidisciplinary teams to ensure project milestones, quality standards, and HSE compliance were consistently met.
Maintained worksite safety, adhering to PTW systems, risk assessments, and company safety procedures.
Supported supervision in inspections, punch-list resolution, and quality verification for mechanical and civil works.

Technician

Sonatrach (GCB), Algeria
Jan 2005 - Jan 2007 · 2 سنوات

Engaged in civil, mechanical, and piping works for industrial projects, Participated in equipment installation, testing, and commissioning, Assisted in equipment installation, testing, and commissioning, Coordinated with multidisciplinary teams

Administrative & Insurance Checker

CNAS – El Oued, Algeria
Jan 2002 - Jan 2004 · 2 سنوات

Managed administrative processes and documentation for CNAS affiliates, ensuring accurate record-keeping and compliance with internal procedures.
Conducted insurance verification and eligibility checks, confirming that affiliate records, coverage, and contributions were up-to-date and compliant.
Assisted in processing claims, renewals, and membership updates, coordinating with multiple departments to streamline administrative workflows.
Maintained databases and reporting systems, generating regular reports on insurance status, discrepancies, and compliance metrics.
Ensured strict adherence to regulatory requirements and internal CNAS policies, contributing to operational efficiency and quality assurance.
Provided support and guidance to affiliates regarding administrative procedures, insurance processes, and documentation requirements.

Site Engineer Steam Blowing

Halliburton / QatarEnergy / CTJV NFE EPC 1 LNG projects, Ras Lafan – Al Khor Industrial City, Qatar
Jan 2026

Executed steam blowing and commissioning activities across multiple utility and process systems, Handled steam blowing for Boiler Feed Water (BFW) systems and 75PR steam networks, Supervised activities related to Gas Turbine Generators (GTG) and Combined Turbine Generators (CTG-01, CTG-02, CTG-03), Managed steam blowing in strainer/filter systems and deaerator areas, Performed monitoring of letdown stations to control pressure reduction, Executed blowdown operations in critical areas

Sr Supervisor All Process Pre Commissioning & Commissioning EPC NFE

CTJV – NFE EPC1 LNG Project / Halliburton Qatar - Qatar Energy
Feb 2025

Led lube oil flushing operations for Train 8 and Train 9 systems at Ras Laffan, achieving ISO 4406 cleanliness (NAS 4 & NAS 5) for critical equipment such as Main Air Blowers, compressors, turbines, and hydraulic loops.
Managed the transition from Baker Hughes oil polishing equipment to full-scale flushing with both external skids and permanent pumps, ensuring system integrity and efficiency.
Supervised equipment setup (filtration units, pumps, monitoring instruments) and monitored flushing loops (flow rate, temperature, pressure) to maintain operational parameters.
Ensured strict adherence to HSE protocols with all necessary permits, method statements, and job safety analyses in place.
Coordinated with Halliburton and CTJV teams to align flushing activities with system handovers and client requirements.
Maintained detailed records, cleanliness certificates, and QA/QC documentation for system turnover.

Sr Supervisor All Process Pre Commissioning & Commissioning EPC NFE

CTJV – NFE EPC1 LNG Project / Halliburton Qatar, Ras Lafan, Qatar
Feb 2025

Led lube oil flushing operations for Train 8 and Train 9 systems, Managed the transition from Baker Hughes oil polishing equipment to full-scale flushing, Supervised equipment setup and monitored flushing loops, Ensured strict adherence to HSE protocols, Coordinated with Halliburton and CTJV teams, Maintained detailed records and QA/QC documentation

المهارات

التكليف فحص التآكل التشغيل التجريبي ساب Decommissioning Pipeline & Process Services (PPS) Pipeline & Process Engineer & Supervisor Pipeline Pigging Engineer & PL Pigging Supervisor Flange Management Engineer (FM) Mechanical Supervisor Bolting Trainer Joint Integrity MS Office (Excel Word Outlook) MS Project Pre-commissioning Pipeline Services Process Services Pipeline Engineering Process Engineering Mechanical Supervision Project Engineering Steam Blowing Lube Oil Flushing Nitrogen Leak Testing Chemical Cleaning Pressure Testing Hydrotesting Air Blowing Nitrogen Purging Retro Jetting Pigging ILI Flange Management Bolting Torqueing Tensioning HSE PTW LOTO QA/QC Microsoft Excel Microsoft Word Microsoft Outlook Microsoft Project P&IDs Isometrics Risk Assessment Toolbox Talks Leadership Team Coordination Problem Solving Mentorship Project Coordination Inspection Testing Protocols Pneumatic Testing Vacuum Testing Valve Testing Mechanical Completion