Haytham Anwar Mahmoud Ahmed Gawish

Haytham Anwar Mahmoud Ahmed Gawish

Traffic Tunnels Director
Egypt
English

About Me

Traffic Tunnels Director about 24 years of experience
• Make Study of tunnel Projects.
• Project Manager for tunnels.
• Executive Project Manager for Sewage and Tunnels projects.
• Strategic Planning/Analysis.
• Pro…

Experience

Traffic Tunnels Director

Concord for Contracting and Engineering · Cairo Metro line 4
Present

<p>Make Study of Project.<br>
Make Schedule of Project.<br>
Planning and Defining Scope.<br>
Making plan to supply all raw materials of Project.<br>
Developing Schedules of Project.<br>
Cost Estimating of Project.<br>
Controlling Quality of Project.<br>
Team Leadership of 600 workers and engineers within the project<br>
Planning TBM assembly and tunnel initial phase.<br>
Site preparation works and set up.</p>

Mechanical Maintenance Manager and Project Manager

Concord for Contracting and Engineering · Suez Canal tunnels

<p>Planning TBM assembly and tunnel initial phase<br>
Site preparation works and set up.<br>
Assembly Two TBMs Machine in Project (TBM HK S-958 and S-960).<br>
Dismantling Two TBMs Machine in Project (TBM HK S-958 and S-960).<br>
Assembly STP and Grout plant of Two TBMs in Project.<br>
Make TBM testing and commissioning with HK mechanic.<br>
Assembly Thrust Frame, Shuttering Pipe, Sealing Ring and Cradle outside shaft.<br>
Follow-up Shaft Installation of Two TBM Machine(Thrust Frame, Shuttering Pipe, Sealing Ring, Cradle ..etc.<br>
Procurement operations of the main site / tunnel initial phase.<br>
Make lists of spare parts required during operation for TBM, STP and Grout plant.<br>
Make a maintenance plan for TBM, STP and Grout plant.<br>
Responsible for the Maintenance of the TBM to ensure that the TBM is used in accordance with all requirements.<br>
Follow up production in TBM, STP, and Grout plant.<br>
Follow up operation in TBM, STP, and Grout plant during shift.<br>
Make TBM preventive maintenance lists according to manufacturer manual and approved by HK.<br>
Follow up preventive maintenance check dates (daily, weekly, monthly, annual)<br>
Follow up TBM spare parts stocks, purchase order and delivery time.<br>
Follow up oil samples analyzing dates and reporting results.<br>
Follow-up consumption of grease (WR 90, WR 89, EP2, HBW) and hydraulic oil in TBM.<br>
Prepare all TBM mechanical team requirements (spare parts, equipment, tools … etc.)<br>
Follow TBM preventive maintenance through.<br>
Follow up and reporting mechanical breakdowns on the TBM<br>
Maintenance: All drilling equipment machines, Hydraulic circuits, Hydraulic pumps, Rotary equipment..etc.<br>
Team Leadership of 400 workers and engineers within the project</p>

Executive Project Manager

SALCO Saudi Contracting Com · Al Medina, Saudi Arabia

<p>Executive Project Manager for Tunnels Discharge Rain and Torrents Water Project.<br>
Make project schedules.<br>
Site preparation works and set up.<br>
Procurement operations of the main site.<br>
Follow-up the implementation of Discharge Rain and Torrents network.<br>
The implementation of all shafts (jacking and receiving) for Microtunnel machines.<br>
Responsible of operation & maintenance for Herrenknecht Microtunnel machines.<br>
Make a maintenance plan for Herrenknecht Microtunnel machines.<br>
Follow up spare parts stocks, purchase order and delivery time.<br>
Maintenance: All drilling equipment machines, Hydraulic circuits, Hydraulic pumps, Rotary equipment... etc</p>

Mechanical Maintenance Manager

Concord for Contracting and Engineering

<p>Executive Project Manager for some of the above-mentioned projects.<br>
Follow-up the implementation of Sewage network, Tunnels and all shafts (jacking and receiving).<br>
Make a maintenance plan for Herrenknecht AVN machines.<br>
Follow up AVN machines spare parts stocks, purchase order and delivery time.<br>
Prepare all AVN machines mechanical team requirements (spare parts, equipment, tools … etc.).<br>
Follow up preventive maintenance check dates (daily, weekly, monthly, annual)<br>
Maintenance: All drilling equipment machines, Hydraulic circuits, Hydraulic pumps, Rotary equipment, High pressure water pumps (slurry pump and feed pump) and Separation plant.<br>
Working as an operation Engineer and Responsible of maintenance on different Herrenknecht tunneling machines from AVN 600 to AVN 3200.<br>
Design & Fabrication of (Cutting Head, Upsizing, Open face machines & a lot of intermediate jack stations).<br>
Dealt with all soils (sand, clay, rock, mixture…).<br>
Work in Insulation and PVC for all diameters in Microtunnel.</p>

Quality Control Engineer

Petrobel Company · Project Abu Redees

<p>Inspection for all material and casting (i.e., Carbon Steel, Stainless Steel, Steel Alloys, Aluminum, Aluminum-Base Alloys, Copper, Copper-Base Alloys.… etc.).<br>
Inspection for all welding process (i.e., Shielded metal-arc welding (SMAW), Gas tungsten-arc welding (GTAW), Submerged-arc welding (SAW), Gas metal-arc welding (GMAW), Oxyfuel gas welding (OFW), Flux-cored arc welding (FCAW)).<br>
Welding procedure by nondestructive test (Visual test, Dye penetrant test, Magnetic test, Radio graphic test, Ultra Sonic test).<br>
Welding procedure by destructive test (Tensile test, Bend test, Fracture test, Notch toughness)</p>

Skills

Project Management Strategic Planning Analysis Profit Maximization Cost Control Budget Management Team Leadership Process Improvement Mechanical Maintenance Drilling Equipment Maintenance Hydraulic Circuits MS Office AutoCAD Quality Control Scheduling Scope Definition Cost Estimating Procurement TBM Assembly TBM Commissioning Preventive Maintenance Microtunneling Sewage Networks Tunnel Projects Operation and Maintenance Welding Inspection Non-Destructive Testing
Report this Profile?