PMS Engineers Peenya and GISL
Posted:
26 June 2026 (30+ days ago)
Application Deadline:
23 September 2026
Vacancies:
1 Vacancy
Job Summary
Qualification:
B.E/ in Electrical & Electronics
Engineer and Diploma
Engineer and Diploma
Rules and Responsibilities:
- Minimum 5 years of experience in engineering and commissioning Power Management Systems (PMS) including primary equipment monitoring and control load shedding load sharing and synchronization.
- Hands-on experience in designing substation network architecture and control philosophy for process and power plants.
- Strong working knowledge of utility communication protocols (e.g. IEC 61850 OPC Modbus DNP3 IEC 101/104 TCP/IP Prefabs Profinet Fieldbus SPA) including OT/IT convergence and cybersecurity.
- Proficient in using application engineering tools for Distributed Control Systems (DCS).
- Experience configuring controllers protocol gateways and data concentrators with various communication protocols.
- Experience working with manufacturer IEDs on IEC 61850 protocol including creation of IEC ICD CID and SCD files.
- Familiarity with ABB 800xA is an added advantage.
- Minimum 5 years of experience in engineering and commissioning Power Management Systems (PMS) including primary equipment monitoring and control load shedding load sharing and synchronization.
- Hands-on experience in designing substation network architecture and control philosophy for process and power plants.
- Strong working knowledge of utility communication protocols (e.g. IEC 61850 OPC Modbus DNP3 IEC 101/104 TCP/IP Prefabs Profinet Fieldbus SPA) including OT/IT convergence and cybersecurity.
- Proficient in using application engineering tools for Distributed Control Systems (DCS).
- Experience configuring controllers protocol gateways and data concentrators with various communication protocols.
- Experience working with manufacturer IEDs on IEC 61850 protocol including creation of IEC ICD CID and SCD files.
- Familiarity with ABB 800xA is an added advantage.
Required skills:
- Strong knowledge of Power system and IEC (5 years preferred).
- Power Management System (PMS)
- IEC 61850 / IEC 101/104
- Substation Automation