Enter a job title or keyword

VDC Engineer Data Center Construction

Sundt Construction


Job Location:

Haskell, TX - USA

Monthly Salary: Not provided by the employer
Posted: 22 August 2026 (30+ days ago)
Application Deadline: 19 November 2026
Vacancies: 1 Vacancy

Job Summary

Description

Job Summary

This position is the technical source of modeling information for various projects. The person that fills this role will need to have a thorough knowledge of construction documents specification and shop drawings.
Candidate will create 3D/4D/5D models of any given project.

Key Responsibilities

1. Creates 3D models of Architectural Structural and MEP systems.
2. Maintains model libraries using correct uniformat or masterformat codes.
3. Participates in activities to support the companys strategic planning efforts.
4. Performs all primary job responsibilities of Virtual Construction Technician.
5. Reviews bid scope documents for appropriate BIM language based on project delivery type and BIM deliverables.
6. Trains virtual construction technicians in use of company approved software.
7. Virtually walks through the model identifying elements that are out of place.

Minimum Job Requirements

1. 3 years blue print/specification reading.
2. 3 years in Autocad/Revit/Navisworks/CPM scheduling software.
3. 4 year degree in Construction Management Engineering or Architecture.
4. 4 years construction experience.
5. Proficient use of all Microsoft Office Suite programs.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1. May stoop kneel or bend on an occasional basis
2. Must be able to comply with all safety standards and procedures
3. Required to use hands to grasp lift handle carry or feel objects on a frequent basis
4. Will interact with people and technology frequently during a shift/work day
5. Will lift push or pull objects pounds on an occasional basis
6. Will sit stand or walk short distances for up to the entire duration of a shift/work day.
7. Will use telephone computer system email and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

Safety Level

Non-Safety Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as

operating a vehicle operating equipment operating machinery or power tools repairing/maintaining the operation of any vehicle/equipment the handling/disposal/transport of hazardous materials or the handling/treatment/disposal of potentially flammable/combustible materials.




Required Experience:

IC


About Company

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate ab ... View more

View Profile View Profile