Enter a job title or keyword

Senior Construction Scheduler

Zachry


Job Location:

Katy, TX - USA

Monthly Salary: Not provided by the employer
Posted: 29 September 2026 (14 days ago)
Application Deadline: 27 December 2026
Vacancies: 1 Vacancy

Job Summary

Build Your Future with a Company Thats Built America for Over a Century

For more than 100 years Zachry Construction Corporation has been shaping Americas infrastructure from highways and bridges to major civil projects that connect communities and strengthen our nation. As a family-owned companywevebuilt our reputation on integrity innovation and an unwavering commitment to our people.


At Zachryyourenot just joining a construction companyyourejoining a family that values hard work teamwork and doing the right thing becauseitsthe right thing to for dedicated individuals who are ready to grow their careers and make a lasting impact.


Our Core Values guide everything we do: Every Person Matters Together We Can Do Great Things This Is More Than a Job.


Position Summary

TheSenior Scheduleris responsible forcreating construction schedules using Primavera Project Planning software (P6) coordinating project reporting to clients managing resource requirements and providing two-week advance schedules and other schedule updates. This role will provide schedule analysis progress reports and change impact analysis to support efficient project execution and ensure schedule integrity across all phases of construction.


WhatYoullDo

  • Developmonitor and update integrated project plans and schedules to ensure projects are executed in the most efficient manner possible.
  • Prepare baseline schedules and schedule basis documents for approval by project teams.
  • Assess impacts on the critical path and near-critical activities and report findings to the project team.
  • Monitorschedule deviations and variances andassistin developing corrective action methods.
  • Prepare and provide schedule progress reports trending charts and schedule analysis on a periodic basis.
  • Maintaina record of scope changes trends and variances that affect schedule performance.
  • Ensure the credibility and accuracy of schedule information through consistent review and validation.
  • Review schedules with project team members regularly to incorporatetimelydata and progress updates.
  • Analyze and verify schedules from subcontractors and vendors for logic and accuracy.
  • Evaluate activity sequences for constructability andidentifyopportunities for optimization.
  • Make recommendations to manage float andresequencingactivities to achieve project milestones and target completion dates.
  • Analyze change orders for schedule impacts and recommendappropriateadjustments.
  • Resource load schedules as required by the project team.
  • Conductjob-sitewalks to verify physical progress of scheduled activities.
  • Facilitateproject scheduling and interactive planning meetings as needed.
  • Participatein project and departmental staffmeetings.
  • Comply withestablished scheduling practices and procedures.
  • Document and record project historical schedule information and lessons learned for future reference.
  • Provide guidance and training to developing planners.
  • Perform otherduties asassigned by management.

This job summary is intended to describe the general nature and level of work performed by individuals assigned to this position. It is not intended to be an exhaustive list of responsibilities duties and skillsrequired.


WhatWereLooking For

  • Strong prioritization and organizational skills; detail-oriented
  • Strong working knowledge of Microsoft programs such as Excel and Word
  • Excellent verbal and written communication skills
  • Proficiency in Primavera P6 is strongly preferred
  • Minimum of5years of experience as a Scheduler on heavy/highway construction projects (Structures Bridges Underground Earthwork and Concrete Paving)
  • Bachelors Degree in Civil Engineering or a similar discipline is preferred
  • Field operations experience is strongly preferred
  • Flexibility with relocation for assigned projects


WhyYoullLove Working with Us

At Zachry we invest in our people becausetheyrethe foundation of our to offer career growth opportunities long-term stability and a culture built on trust and respect.


Our Industry-Leading Benefits Include

  • Comprehensive Medical Dental Vision and Life Insurance
  • 401(k) with 6% dollar-for-dollar company match Paid Time Off and an annual Performance Bonus Program
  • Company-paid short- and long-term disability insurance
  • Employee Assistance Program (EAP) for you and your family
  • Opportunities for training professional development and advancement


Zachry Construction Corporation performs heavy civil and building work throughout the United States. Relocation may berequiredfor ongoing opportunities and career growth.


We are proud to be an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race color sex sexual orientation gender identity religion national origin disability veteran status or any other legally protected status.


We do not sponsor or transfer sponsorship of an employment visaat this do not interview or hire students in F-1 or J-1 status and will not sponsor them for work visas.


To learn more about our legacy and projects visit.


Required Experience:

Senior IC