Enter a job title or keyword

Engineering Change Order (ECO) Engineer


Job Location:

Allendale, MI - USA

Yearly Salary: $ 65000 - 75000
Posted: 23 August 2026 (30+ days ago)
Application Deadline: 20 November 2026
Vacancies: 1 Vacancy

Job Summary

Full-time
Description

The Engineering Change Order (ECO) Engineer is responsible for managing and coordinating the generation and revision of all engineering technical documentation through the Engineering Change Order (ECO) process. This role ensures that design documentation and production updates are accurately documented processed communicated and implemented across all departments.

  • Defines characterizes and leads all aspects of Engineering Change Orders (ECOs) included but not limited to engineering technical documentation generation and revision through the initiation execution and implementation of ECOs.
  • Monitor customer feeds for changes that may trigger an ECO.
  • In depth review of all new specification and drawing updates to clearly identify changes.
  • Assures sound engineering principals are applied to all processes and documentation.
  • Develop a working understanding of manufacturing processes to facilitate collaboration with other engineers.
  • Management of Methods of Manufacture (MOM) and Bills of Material (BOM) in current and future ERP systems.
  • Actively listen probe and identify concerns. Develop credibility loyalty trust and commitment specifically with manufacturing subject matter experts.
  • Other assignments as required.


Requirements
  • Requires a multidisciplined background with a focus on engineering documentation.
  • Demonstrated success managing Engineering Change Orders
  • Communication skills - must have good listening skills in addition to excellent verbal and written communication abilities.
  • Excellent organizational skills attention to detail and documentation practices.
  • Ability to multitask.
  • A proven understanding of part and quality workmanship.
  • Ability to analyze data and make recommendations.
  • Must be capable and willing to share knowledge and develop associates.
  • Bilingual English/Spanish a plus.
  • Ability to work with all levels of personnel from company president to production associates.

Education & Experience

  • Bachelors degree in mechanical engineering or similar technical field.
  • Years Experience: 2 years in engineering document control or related technical field.
  • Experience working with engineering change orders or similar technical documentation a plus.
  • Must be an intermediate to advanced skilled user of Excel.
  • Familiarity with ERP systems preferred.
  • Experience in a manufacturing environment a plus.

Working Conditions

  • While performing the duties of this job the employee occasionally works near moving mechanical parts and is occasionally exposed to wet and/or humid conditions ambient air fumes or airborne particles.
  • The noise level in the work environment is usually moderate but occasionally high requiring safety equipment to be utilized.

Physical Requirements

  • The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job.
  • Candidate must be able to perform the physical responsibilities of the job utilizing arms hands and fingers to perform complex functions of manufacturing parts and performing other duties of the job e.g. standing sitting walking through the facility and stairs bending squatting kneeling etc.
  • Ability to lift or move items weighing up to 50lbs preferred.

Pay: $65000.000-$75000/year


Benefits:

Eligible after 1st day:

  • Paid holidays
  • Employee Assistance Program

Eligible after 90-day probation period:

  • Medical Dental Vision Basic Life/AD&D Insurance Voluntary Term Life/AD&D Insurance
  • Health Savings Account (HSA) Flexible Spending Account (FSA) Dependent Care Account Commuter Transportation Management Account
  • Vacation time
  • Sick time

Eligible after 1 year of service:

  • 401(k) with Employer Match
  • Potential for discretionary bonus

The final pay offered to a successful candidate will be dependent on several factors that may include but are not limited to the type and years of experience within the job the type of years and experience within the industry education etc.

Were proud to be an equal opportunity employer.

This means we actively pursue ways to celebrate our differences and dont discriminate based on an individuals race (including traits historically associated with race such as hair texture hair type and protective hairstyles including braids locks and twists) creed national origin nationality religion ancestry age (40 or over) sex (including pregnancy) familial status marital status civil union or domestic partnership status affectional or sexual orientation gender identity or expression mental or physical disability (including perceived disability AIDS and HIV status) atypical hereditary cellular or blood trait genetic information because of liability for service in military status as a smoker or non-smoker status as a registered medical marijuana user or any unlawful criterion existing under applicable federal state or local laws.

If you need assistance or an accommodation due to a disability contact us at


Required Experience:

IC