Enter a job title or keyword

Construction Scheduling Analyst 3 – Airports, Energy & Infrastructure

Connico


Job Location:

Nashville, TN - USA

Yearly Salary: USD 90000 - 110000
Posted: 6 August 2026 (30+ days ago)
Application Deadline: 3 November 2026
Vacancies: 1 Vacancy

Job Summary

Construction Scheduling Analyst 3 Airports Energy & Infrastructure

Build the schedules that keep airports running.
Join a team delivering complex high-impact airport energy and infrastructure projects across the country where your schedule analysis directly shapes how multi-million-dollar programs get sequenced and delivered.

Company Overview
Connico is a leading national construction consultancy known for its extraordinary team and commitment to superior client service. Founded in 1990 we offer highly specialized consulting services unique to the architecture engineering and construction industries. As experts in aviation and transportation we assist owners architects engineers and planners with cost estimating scheduling planning and project management.

The Opportunity
As a Scheduling Analyst 3 you take ownership of schedule updates logic validation and quantity-based analysis on large-scale infrastructure projects primarily airports. You will build and defend your own scheduling work communicate findings directly to internal teams and clients and begin mentoring the analysts coming up behind you.

This role is ideal for someone who has moved past learning Primavera P6 and is ready to own the analysis. Someone who spots sequencing conflicts before they become delays and can explain to a client what the schedule is actually telling them.

What Youll Do
Schedule development and execution

  • Build detailed construction schedules using Connicos templates and standards - durations sequencing logic and constraints drawn from design documents client requirements and construction methodology.
  • Independently create and manipulate work breakdown structures to meet internal project and client-specific needs.
  • Contribute to resource- and cost-loading assign baselines determine variances and bring forward recommendations.
  • Develop production rates from historical project data with growing independence over time.
  • Support phasing and sequencing plans and contribute inputs to Monte Carlo simulations and risk matrices alongside senior team members.
Analysis and plan review
  • Review architectural engineering and civil drawings and specifications to identify sequencing needs scheduling impacts and conflicts.
  • Flag gaps inconsistencies and phasing challenges - proposing solutions rather than just raising the issue.
  • Develop schedule assumptions milestone summaries sequencing notes and value engineering ideas for client-facing deliverables.
  • Prepare visual schedule outputs and QA reports using P6 exports Excel Power BI and Connico formatting standards.
Collaboration and client engagement
  • Communicate schedule assumptions progress risks and changes clearly to internal and external stakeholders.
  • Participate in schedule review update and reconciliation meetings maintaining accurate documentation and version control.
  • Support the development of Analyst 1s and 2s by reviewing their methods activity lists and outputs.
  • Contribute to internal templates training materials and sequencing checklists.

What You Bring
  • 3-5 years of progressive construction scheduling experience including independent execution of schedule updates and logic reviews.
  • Bachelors degree in construction management engineering quantity surveying architecture or a related field - or equivalent working knowledge.
  • Proficiency in Primavera P6.
  • Ability to read and interpret architectural and engineering drawings and specifications at a ROM level with minimal oversight.
  • Strong command of production rates WBS development baseline assignment and variance analysis.
  • Proficiency in Microsoft Office including Excel Outlook Word and Teams.
  • Some travel required: 10-25%(site visits client meetings conferences)
Preferred
  • Certification such as PMI-SP PSP AACE CCT or equivalent.
  • Familiarity with Time Impact Analysis (TIA) EVM reporting and project controls terminology.
  • Experience performing or contributing to cost and schedule risk assessments (CSRA).
  • Experience with Oracle Primavera Cloud (OPC) Power BI and Adobe Acrobat.
  • Experience contributing to schedules on multi-phase or complex programs.
Sector experience that stands out
Any of the following is a meaningful plus:
  • Aviation
  • Energy: commercial nuclear power generation green and renewable power generation power distribution and power transmission including high voltage
  • Data centers and data infrastructure
  • Government and military scheduling

Why Join Connico
  • Base salary $ with bonus opportunities (commensurate with experience)
  • Opportunity to work on complex high-visibility airport energy and infrastructure projects
  • Strong culture of collaboration respect and technical excellence
  • A clearly defined career path and development support

Work Location Options
Hybrid (T/W/TH in-office):
  • Hebron KY (Cincinnati area)
  • Mt. Juliet TN (Nashville area)
Some travel required: 10-25% (site visits client meetings conferences)

Apply today to join Connico and bring your scheduling expertise to the forefront of airport energy and infrastructure project delivery!

Required Experience:

Manager


About Company

Company Logo

A smart plan makes for a smooth project Our experience with complex projects allows for a unique perspective during the design and construction process. View All Projects High standards backed by vast experience With more than 30 years in the architecture, engineering, and constructio ... View more

View Profile View Profile