Flexible Work Arrangement: HybridThe (Sr.) Manager Power Systems Modeling Department is responsible for ensuring reliable operation and maintenance of the PJM Energy Management System (EMS) Transmission Network Advanced Applications (TNA) and its related databases and interfaces. This
Flexible Work Arrangement: HybridThe (Sr.) Manager Power Systems Modeling Department is responsible for ensuring reliable operation and maintenance of the PJM Energy Management System (EMS) Transmission Network Advanced Applications (TNA) and its related databases and interfaces. This
*Flexible Work Arrangement: Hybrid*PJM plays an essential role in ensuring the reliability of the electricity grid covering over 65 million people in the Eastern Interconnection. PJM runs the largest competitive wholesale electricity market that looks forward to incorporate the everch
*Flexible Work Arrangement: Hybrid*PJM plays an essential role in ensuring the reliability of the electricity grid covering over 65 million people in the Eastern Interconnection. PJM runs the largest competitive wholesale electricity market that looks forward to incorporate the everch
Flexible Work Arrangement: HybridResponsible for the design implementation and maintenance of PJMs critical network infrastructure components used to support PJMs mission critical applications along with back-office systems. Network administrator will support multiple network systems
Flexible Work Arrangement: HybridResponsible for the design implementation and maintenance of PJMs critical network infrastructure components used to support PJMs mission critical applications along with back-office systems. Network administrator will support multiple network systems
Flexible Work Arrangement: HybridThrough this 24-month program participants experience three hands-on technically challenging 8-month rotations in different divisions at PJM. The program is designed to build a fundamental understanding of the operation of the power grid from a real-ti
Flexible Work Arrangement: HybridThrough this 24-month program participants experience three hands-on technically challenging 8-month rotations in different divisions at PJM. The program is designed to build a fundamental understanding of the operation of the power grid from a real-ti