Hkrp Innovations
1 Site survey and prepare site report
2 installation testing and commissioning of systems as per design
3Operation and Maintenance of the complaints at assigned locations within stipulated time
4Provide all the information drawing photos and documents to reporting authority
5 Daily reporting to reporting authority about work done and pendency of work using call message or email
6 Coordinate with DISCOM or GETCO authority at Circle Division Subdivision or substation level
7 To provide installation service and analysis report as per requirement in provided format
8 To plan with report reporting authority in advance for Installation and Commissioning with required material
9 Follow all the standard procedures defined for using tools and components addressing complaints etc
10 Maintain spares and material for maintenance with daily reporting.
hardware testing,test automation,troubleshooting,pcb design,debugging