- Scope: Integrating Rockwell and Siemens-based AGVs with Rockwell production line PLCs.
- Duration: Mid-January through April.
- Schedule: MF 50 hours/week (Saturdays as needed).
More specific details regarding InScope Tasks: - Equipment Safety Validation
- Verify hardware labeling (per EPLAN drawing packages)
- Happy Path Commissioning (endtoend functional flow)
- HMI Functionality
- Alarming
- Fault Injection & Troubleshooting AGVs (Recovery sequences)
- Interlocking
- Prod/Cons with AGV
- Prod/Cons with Line PLCs
- Validate AGV Config (paths parameters)
- Validate Comms & Fleet Manager Setup
- Commissioner App Checklists
- Safety Buyoffs
- Redlining EPLAN packages for OnSite Install
|
Scope: Integrating Rockwell and Siemens-based AGVs with Rockwell production line PLCs. Duration: Mid-January through April. Schedule: MF 50 hours/week (Saturdays as needed). More specific details regarding InScope Tasks: Equipment Safety Validation Verify hardware labeling (per EPLAN dra...
- Scope: Integrating Rockwell and Siemens-based AGVs with Rockwell production line PLCs.
- Duration: Mid-January through April.
- Schedule: MF 50 hours/week (Saturdays as needed).
More specific details regarding InScope Tasks: - Equipment Safety Validation
- Verify hardware labeling (per EPLAN drawing packages)
- Happy Path Commissioning (endtoend functional flow)
- HMI Functionality
- Alarming
- Fault Injection & Troubleshooting AGVs (Recovery sequences)
- Interlocking
- Prod/Cons with AGV
- Prod/Cons with Line PLCs
- Validate AGV Config (paths parameters)
- Validate Comms & Fleet Manager Setup
- Commissioner App Checklists
- Safety Buyoffs
- Redlining EPLAN packages for OnSite Install
|