Employer Active
Job Alert
You will be updated with latest job alerts via emailJob Alert
You will be updated with latest job alerts via emailNot Disclosed
Salary Not Disclosed
1 Vacancy
Job Summary:
1.1. Responsible for new product quality requirement PQE function.
1.2. Ensure products manufactured meet Customer requirements.
1.3. Responsible for Line process control and complaint management.
1.4. Develop review and monitor the effectiveness of quality control procedures and processes propose and implement improvements where necessary.
1.5. Ensure closed loop of internal and external audit finding include product safety audit.
1.6. Monitor and supervise QMM technician performance to ensure efficiency in quality management process.
1.7. Responsible for process improvement project and update Management on the improvement result.
1.8. Responsible for Quality problem resolution through problem solving sheet PSS/8D.
1.9. Responsible for inspection plan for incoming and outgoing (FQ VQ).
1.10. Responsible for component first article inspection approval (ISIR) and approval on incoming part inspection plan including cost reduction activities without delay.
1.11. Monitor report of KPIs in timely manner and establish action plan.
Job Scope:
2.1 NEW PRODUCT INTRODUCTION
2.1.1. Responsibility for Start up projects warranty customer complaint first article approval (ISIR) reliability testing etc.
2.1.2. New project product qualification test include fulfill the regulation requirement.
2.1.3. Actively involves in UX QG FMEA PQP and production line release. Ensure all the QG open point closed within defined due date or latest 3 months after SOP.
2.1.4. Prepare product test plan product inspection plan (EP) QZ test plan (QZTI) and FQ/VQ checklist.
2.1.5. Provide training to QMM test technician on all the related inspection plan and checklist.
2.1.6. Work with service center to understand the product quality level in the market at least monthly reporting is expected.
2.1.7. Coordinate project testing investigate the failure and ensure close loop of the action implemented.
2.1.8. Responsible for part release.
2.1.9. Ensure all ISIR requirements are fulfill before ISIR released i.e. Cpk > 1.33 PQA sign off control
plan and released critical components supplier qualification process.
2.1.10. To ensure measurement methodology alignment between PgP2 and supplier during technical
discussion with supplier via PQA.
2.1.11. To ensure all related fixture including incoming inspection short endurance for VQ/FQ audit
practical tests are ready 2 weeks before pilot.
2.2. OPERATION SUPPORT:
2.2.1. Responsible for in process & outgoing product quality performance.
2.2.2. Responsible for MSA calibration concession management customer complaint management etc.
2.2.3. Provide assistance to resolve line FOR issues.
2.2.4. Support PUQ on supplier incoming material quality issue disposition and 8D verification and evaluation.
2.2.5. Support cost saving activities and approve alteration change.
2.2.6. Regular review with production personnel for PQP and FMEA.
2.2.7. Perform failure analysis on customer warranty complaint tool and drive for improvement to achieve the agreed target. Target to roll out improvement actions within 3 months after solution is defined.
2.2.8. Ensure ANDI/CR contents is checked before release and implemented correctly.
2.2.9. Conduct periodic audits to ensure line and process compliances. Expected monthly audit reporting is needed to submit to supervisor and include action plan of manufacturing.
2.2.10. Conduct Failure Investigation with cross-functional team eg. ENG PUQ MSE for non-conformance incidents if needed.
2.2.11. Drive cross functional team for Quality process improvement (e.g. Elimination of inspection warranty limit).
2.2.12. Responsible for plant to plant quality complaint management.
2.2.13. Responsible for product transfer on quality measures between plant.
2.2.14. Responsible for monthly Product CIP Process CIP warranty analysis reporting.
Qualifications :
Remote Work :
No
Employment Type :
Full-time
Full-time