Inward Quality Engineer (IQC)
Posted:
25 October 2026 (Yesterday)
Application Deadline:
22 January 2027
Vacancies:
1 Vacancy
Job Summary
Role & responsibilities
Inward Inspection
- Incoming inspection of SMT components (marking purchase order supplier invoice actual part verification value if applicable and packaging condition).
- Incoming inspection of local components such as plastic casing battery harness packaging box hardware screws etc.
- Fill the incoming inspection checklist and update the store material inward sheet after inspection. Add a QC sticker to each box.
- Verify the supplier PDI report and maintain records of all supplier PDI reports.
- Perform 100% inspection of OBD cables for the international market using a test bed/multimeter.
- Perform 100% verification of all pigtails (splitter 9-pin etc.) for continuity and visual defects using a tester multimeter or visual inspection.
- Conduct sampling inspection after pre-assembly.
Inward Material Rejection
- Update the rejection summary supplier-wise and material-wise in the rejection sheet for any rejected material.
- Calculate supplier PPM and prepare monthly trends supplier-wise and material-wise for actual tracking and audit purposes.
- Send an email to the supplier regarding any inward material rejection.
- Obtain an 8D report from the supplier for every rejected material.
- Visit the suppliers premises if parts are rejected due to major issues for improvement activities or for trials if required.
- Maintain records of inward rework and material on hold.
- Segregate incoming material supplier-wise or internally in case of urgency.
- Send monthly performance reports to every supplier.
Incoming Process Documents
- Prepare and update all incoming master checklists as required.
- Prepare and update the sampling plan.
- Ensure that drawings for all inward materials are available.
Improvements
- Initiate Kaizen activities whenever possible.
- Initiate corrective actions for incoming material issues whenever possible.
Store
- Monitor whether the store follows the FIFO (First In First Out) system.
- Ensure that a FIFO sticker is affixed to each box.
Others
- Fill out the deviation report if applicable.
- Fill out the engineering change document if applicable.
Packaging List
- Verify the packaging list against the batch material.
- Ensure that all parts listed in the packaging list are available and included in the BOM and alternate sheets.
- Update the packaging list after material verification.
In-house Hardware Changes
- Perform 100% verification of the PCBA after in-house hardware changes.
- Add a sticker/signature after verification.
Required Experience:
IC
About Company
Predict vehicle breakdowns days before they happen, optimize your fleet’s performance and reduce fuel costs with Intangles’ AI-powered platform.