Coordinating with Client and Consultant for finalizing work on time.
Strictly follow IS-CodeSP 34 and BS-8666.
Preparation of Shop/working drawings and taking approval from clients.
Preparation of BBS as per GFC drawing/Architecture drawings and taking approval from Clients.
Preparing Joint measurement reports (JMR) with Client & Sub-contractor.
Preparing reconciliation of steel with Invisible steel.
Planning and checking for Fixing ability and Sequence of fixing.
Checking and Inspection of Schedule (BBS) at site.
Taking monthly physical Quantity and preparing 3 months requirement of steel as per the plan.
Preparation & Checking of Sub-contractor bill.
Calculating exact Quantities of concrete Shuttering and steel.
Has done BBS of pile foundation footing Base slab Sump UPE wall stair-case retaining wall/side wall column concourse slab roof slab Rcc wall pedestal Ancillary building etc.
Laid pile foundation pile-cap foundation/footing Base-slab retaining wall lift-wall concourse- slab column.
Handling steel yard and maintaining records (Inward transfer to site physical stock consumption offset bar scrap etc.) for optimization of steel.
Having good ability to optimizing the wastage.
Preparation of shop drawing for footing Raft Column Pier Pier-cap Beam Base slab concourse slab roof slab duct and other structural element.
Coordination with site team for steel optimization.
Job Description: Coordinating with Client and Consultant for finalizing work on time. Strictly follow IS-CodeSP 34 and BS-8666. Preparation of Shop/working drawings and taking approval from clients. Preparation of BBS as per GFC drawing/Architecture drawings and taking approval from Clien...
Job Description:
Coordinating with Client and Consultant for finalizing work on time.
Strictly follow IS-CodeSP 34 and BS-8666.
Preparation of Shop/working drawings and taking approval from clients.
Preparation of BBS as per GFC drawing/Architecture drawings and taking approval from Clients.
Preparing Joint measurement reports (JMR) with Client & Sub-contractor.
Preparing reconciliation of steel with Invisible steel.
Planning and checking for Fixing ability and Sequence of fixing.
Checking and Inspection of Schedule (BBS) at site.
Taking monthly physical Quantity and preparing 3 months requirement of steel as per the plan.
Preparation & Checking of Sub-contractor bill.
Calculating exact Quantities of concrete Shuttering and steel.
Has done BBS of pile foundation footing Base slab Sump UPE wall stair-case retaining wall/side wall column concourse slab roof slab Rcc wall pedestal Ancillary building etc.
Laid pile foundation pile-cap foundation/footing Base-slab retaining wall lift-wall concourse- slab column.
Handling steel yard and maintaining records (Inward transfer to site physical stock consumption offset bar scrap etc.) for optimization of steel.
Having good ability to optimizing the wastage.
Preparation of shop drawing for footing Raft Column Pier Pier-cap Beam Base slab concourse slab roof slab duct and other structural element.
Coordination with site team for steel optimization.