Enter a job title or keyword

OFCI Procurement Manager Data Center Construction

Sundt Construction


Job Location:

Burlington, CO - USA

Monthly Salary: Not provided by the employer
Posted: 3 July 2026 (30+ days ago)
Application Deadline: 30 September 2026
Vacancies: 1 Vacancy

Job Summary

Description

Job Summary

Leads project-level deployment and field integration activities for Owner Furnished Contractor Installed (OFCI) equipment supporting advanced AI factory and data center infrastructure projects.

Embedded within the project delivery organization this role will serve as the primary coordination lead between centralized supply chain teams suppliers OEMs general contractors subcontractors commissioning teams and field execution stakeholders to ensure successful deployment of mission-critical infrastructure equipment throughout the construction lifecycle.

The Manager will own project-level OFCI execution activities including local design and code-driven change coordination inbound logistics oversight construction sequencing alignment equipment delivery readiness site integration asset tracking startup coordination and commissioning support activities.

This role will play a critical part in ensuring equipment deployment activities remain aligned with project schedules site readiness requirements commissioning plans operational standards and warranty compliance obligations across complex hyperscale infrastructure environments.

The ideal candidate combines strong construction coordination supply chain execution field logistics and mission-critical infrastructure deployment experience with the ability to operate effectively in fast-paced construction environments.

Key Responsibilities

OFCI Project Deployment & Construction Coordination

  • Lead project-level deployment coordination activities for OFCI equipment supporting AI factory and advanced data center construction projects
  • Serve as the primary project execution interface between centralized supply chain organizations construction teams OEMs suppliers and commissioning stakeholders
  • Coordinate construction sequencing and field integration activities related to OFCI equipment installation and deployment
  • Support project execution planning and deployment readiness activities across all OFCI equipment categories
  • Coordinate closely with general contractors subcontractors rigging providers crane operators and field construction teams to support installation readiness and execution alignment

    Local Design Coordination & Change Management

  • Support coordination of local jurisdictional site-specific and code-driven changes impacting OFCI equipment deployment
  • Coordinate field-driven design adjustments interface modifications and change order activities impacting OFCI scope
  • Collaborate with engineering construction suppliers and commissioning stakeholders to support resolution of site integration issues
  • Track and manage site-specific OFCI change coordination activities and deployment impacts
  • Support documentation and communication of field changes installation constraints and project execution risks

Inbound Logistics & Delivery Readiness

  • Oversee inbound OFCI equipment delivery coordination activities from supplier factories staging facilities and logistics providers to project sites
  • Coordinate delivery readiness activities including:
    • Delivery scheduling
    • Site access readiness
    • Laydown yard coordination
    • Equipment staging
    • Rigging and crane coordination
    • Delivery window management
  • Monitor inbound shipment status delivery milestones and site logistics readiness activities
  • Coordinate with logistics providers suppliers and project stakeholders regarding schedule changes delivery risks and deployment impacts
  • Support temporary storage and buffer inventory coordination activities as required

Asset Control Receiving & Preservation Management

  • Coordinate OFCI receiving inspection inventory verification and asset tracking activities
  • Maintain detailed records related to:
    • Equipment receipt
    • Inventory status
    • Chain-of-custody documentation
    • Storage conditions
    • Preservation activities
    • Damage reporting
    • Warranty documentation
  • Coordinate storage conditions environmental controls and preservation activities required to maintain equipment integrity and manufacturer warranty compliance
  • Coordinate maintenance and periodic preservation activities required during staging or storage periods
  • Support issue escalation damage claims coordination and corrective action tracking related to delivered equipment

OEM Startup & Commissioning Support Coordination

  • Coordinate OEM startup support activities aligned with project commissioning plans and schedules
  • Support Site Acceptance Testing (SAT) integrated systems testing startup readiness and commissioning coordination activities
  • Coordinate with commissioning agents OEM field service teams contractors and project stakeholders regarding commissioning schedules and deployment readiness
  • Track commissioning support requirements OEM mobilization schedules and startup coordination activities
  • Support turnover documentation punch list coordination and operational readiness activities

Minimum Job Requirements

  • Bachelors degree in Construction Management Supply Chain Engineering Operations Industrial Technology or related field preferred
  • 7 years of experience supporting construction execution OFCI coordination mission-critical infrastructure deployment logistics coordination or infrastructure project delivery
  • Experience supporting hyperscale data center industrial utility manufacturing semiconductor energy or mission-critical construction projects strongly preferred
  • Familiarity with OFCI equipment deployment construction sequencing and field integration processes
  • Experience coordinating with general contractors subcontractors OEMs rigging providers crane operators commissioning agents and project delivery teams
  • Strong understanding of site logistics equipment receiving staging preservation asset tracking and deployment coordination practices
  • Experience supporting startup commissioning integrated systems testing or operational turnover activities preferred
  • Familiarity with project controls systems logistics tracking tools inventory systems and operational reporting platforms preferred
  • Strong organizational communication problem-solving and stakeholder coordination skills
  • Ability to manage multiple concurrent priorities in fast-paced project execution environments
  • Strong attention to detail and operational execution discipline
  • Willingness to travel extensively to project sites as required

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1. Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes gloves safety glasses hearing protection hardhat vest etc.)
2. May reach above shoulder heights and below the waist on a frequent basis
3. May stoop kneel or bend on an occasional basis.
4. May use telephone computer system email or other electronic devices to communicate with internal and external customers or vendors.
5. Must be able to comply with all safety standards and procedures.
6. Occasionally will climb stairs ladders etc.

7. Required to use hands to grasp lift handle carry or feel objects on a frequent basis.
8. Will interact with people frequently during a shift/work day.
9. Will lift push or pull objects up to 50Ibs. on an occasional basis.
10. Will sit stand or walk short distances for up to the entire duration of a shift/work day.

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle operating equipment operating machinery or power tools repairing/maintaining the operation of any vehicle/equipment the handling/disposal/transport of hazardous materials or the handling/treatment/disposal of potentially flammable/combustible materials.




Required Experience:

Manager


About Company

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate ab ... View more

View Profile View Profile