Enter a job title or keyword

Integrated Master Schedule and Earned Value Management System (IMSEVMS) Surveillance Support Specialist


Job Location:

San Diego, CA - USA

Monthly Salary: Not provided by the employer
Posted: 24 May 2026 (30+ days ago)
Application Deadline: 21 August 2026
Vacancies: 1 Vacancy
The job posting is outdated and position may be filled

Job Summary

Solvere Technical Group is actively seeking a qualified Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist candidate for an upcoming U.S. Coast Guard opportunity. This position is contingent on award.

SPECIFIC DUTIES & RESPONSIBILITIES:

  • Plan organize and conduct EVMS surveillance activities to ensure the shipbuilders management control system complies with EVMS guidelines and provide timely indications of actual and potential problems.
  • Conduct detailed analysis of the Shipbuilders IMS for all OPCs; determine compliance with OPC Production Contract/CLIN requirements DCMA standards and ANSI-EIA 748 guidelines.
  • Maintain OPC physical progressing model using Microsoft Project SharePoint and Power BI; audit shipbuilder reported physical progress as directed by the PMR.
  • Assist in validating Shipbuilder EVM variance reports (CPR CFSR CCDR IMS); reconcile reports and assess system health.
  • Assist in determining PMB compliance and EAC analysis; review Contractor external cost and schedule reports.
  • Identify and analyze schedule conflicts or delays; propose resolutions and provide input to risk management activities.
  • Develop and provide comprehensive EVM/IMS reports and presentations detailing findings risks and recommended corrective actions.
  • Create and update the USCG OPC PRO program plan annually utilizing Primavera or MS Project including WBS work packages task books and time-phased costs.
  • Conduct production surveillance in Shipbuilder facilities and onboard OPCs under construction; conduct CDRL review and generate contract correspondence.
  • Prepare scheduling materials (Gantt Charts Milestone Charts) and attend meetings; provide EVM and IMS status presentations.

REQUIRED KNOWLEDGE SKILLS AND ABILITIES

  • Comprehensive knowledge of shipbuilding processes.
  • Proficiency in MS Project and Primavera scheduling software.
  • Ability to produce EVM reports briefs and presentations.
  • Knowledge of economic statistical accounting and financial analysis principles and techniques.
  • Familiarity with DCMA standards and ANSI-EIA 748 guidelines.
  • Knowledge of DCMA and DCAA auditing organizations and the overall acquisition process.
  • Knowledge of Microsoft Office suite including Word PowerPoint Power BI and Excel.
  • Physical ability to walk through an active shipyard and OPCs under construction.

EDUCATION CERTIFICATION AND EXPERIENCE:

  • Bachelors degree in an engineering or related technical/business field required or Five (5) or more additional years of relevant experience or EVM certification (EVMP or EVMD/EVMO).

  • Minimum of five (5) years of experience supporting project management and shipbuilding processes required.

WORK LOCATION:

  • Mobile AL

SECURITY:

  • Secret level security clearance required.
  • Non-Disclosure Agreement (NDA) required.

BENEFITS

Solvere offers a comprehensive and generous benefits package. The Solvere benefits package includes medical dental and vision insurance for the employee and/or families. Solvere also includes basic life insurance plus short- and long-term disability for the employee. Employees may elect to enroll in our companys 401k plan. Employees will also accrue paid time off and holidays. Additional voluntary options include supplemental insurance plans.

About the Company Visit:

Solvere Technical Group is committed to non-discrimination and equal employment opportunity. All qualified applicants will receive consideration for employment without discrimination based on disability protected veteran status or any other characteristics protected by law.


Required Experience:

IC