Enter a job title or keyword

INSPECTION RESIDENT ENGINEER

ADYD Group


Job Location:

Madrid - Spain

Monthly Salary: Not provided by the employer
Posted: 31 August 2026 (14 hours ago)
Application Deadline: 28 November 2026
Vacancies: 1 Vacancy

Job Summary

At ADYD Group we continue to grow and remain committed to attracting and developing the best talent within the engineering sector.

We are a company driven by opportunities and talent dedicated to providing services in Design Project Engineering Outsourcing and Training.

We are looking for a INSPECTION RESIDENT ENGINEER

Primary Objective: Guarantee error-free assembly avoid rework and minimize/avoid the risk of delays to achieve the supply schedule.

Required Knowledge:

1- Mechanical assembly of complex industrial equipment

2- Stack assembly procedures interpretation and execution (sequence torque alignment manuals...).

3- Instrumentation cabling and pneumatic systems

4- Interpretation of mechanical drawings 3D models. wiring diagrams

5- ITPs leak testing pressure testing FAT welding procedures and welded construction inspection

6- Industrial quality assurance and Non-Conformities management

Main Responsibilities & Activities:

1- Assembly Supervision

  • Doublecheck and witness execution of assembly according to approved assembly sequence protocols vendor instructions technical manuals and engineering drawings.

  • Follow-up of quality inspection plans (ITPs) and oversee of calibrated tools and torque procedures.

2- Quality Control

  • Oversee assembly checklists and critical hold points.

  • Review of Non-Conformities and promote immediate corrective actions.

  • Oversee integrity and proper execution of welded joints critical interfaces and header connections with the authority to hold and report assemblies not meeting Nucera/MOEVE/ITP requirements

3- Witnessing Tests

  • Leak tests. Pressure tests. Mechanical inspections welded constructions other relevant tests

4- Schedule Monitoring support and expediting

  • Identify risks of delays caused by mis-assembly missing materials or rework.

  • Promote the alignment between NCA and SH regarding manufacturing plan (availability of materials instructions and components

  • Confirm readiness of delivery of assembled goods to the Project site and support with the release note.