PANDIYARAJAN Muthu

PANDIYARAJAN Muthu

E&i Qa/qc
India
Tamil, English, Hindi

About Me

Instrumentation and E&I professional with (Total 19 Years)12+ years of experience in Oil & Gas, refinery, power generation and process industries. Experienced in E&I QA/QC inspection, instrumentation commissioning, preve…

Experience

E&I QA/QC Deputy Manager

L&T ENERGY HYDROCARBON
Aug 2025 - Present · 1 year 3 months

<p>Project: IOCL Panipat Refinery – Fluidized Catalytic Cracking (FCC) Unit, Reactor–Regenerator System<br>
Client: Indian Oil Corporation Limited (IOCL), Panipat, India</p>

E&I QA/QC Inspector & Commissioning Engineer

GALAXY ENERGY CONTRACTING LLC · Abu Dhabi, UAE
Feb 2025 - May 2025 · 3 months

<p>Project: ADNOC Gas Processing – Ruwais Capacity Enhancement, NGL Train 3<br>
Client: ADNOC Gas Processing, Abu Dhabi, UAE</p>

E&I QA/QC Inspector & Commissioning Engineer

GALAXY ENERGY CONTRACTING LLC · Abu Dhabi, UAE
Sep 2024 - Jan 2025 · 4 months

<p>Project: ADNOC Gas Processing – Ruwais Capacity Enhancement, NGL Train 4<br>
Client: ADNOC Gas Processing, Abu Dhabi, UAE</p>

Instrumentation Commissioning Assistant Manager

DOOSAN POWER SYSTEMS · Uttar Pradesh, India
Dec 2022 - Aug 2024 · 1 year 8 months

<p>Project: Jawaharpur Vidyut Utpadan Limited – Thermal Power Plant (2 × 660 MW)</p>

E&I QA/QC Inspector

JEONGSHIN CONSTRUCTION CO. L.L.C.
Feb 2014 - Aug 2014 · 6 months

<p>Project: Construction of New Fuel Oil Unloading Marine Terminal, Jetty No. 2, Rabigh Power Plant<br>
Client: Saudi Electricity Company, Saudi Arabia</p>

I&C QA/QC Inspector

DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO., LTD.
Jun 2012 - Oct 2013 · 1 year 4 months

<p>Project: Rabigh Power Plant No. 2 (4 × 700 MW)<br>
Client: Saudi Electricity Company, Saudi Arabia</p>

Instrumentation Engineer

ENMAS O&M SERVICES PVT. LTD.
May 2010 - Apr 2012 · 1 year 11 months

<p>Project: 90 MW Power Plant (2 × 30 MW), CFBC Boiler<br>
Client: Uttam Galva Steel and Power, Donvat, Mumbai</p>

Instrumentation Engineer

ENMAS O&M SERVICES PVT. LTD.
May 2007 - May 2010 · 3 years

<p>Project: 20 MW Power Plant<br>
Client: Sambhav Energy Limited, Sirohi, Rajasthan</p>

Skills

Instrumentation Installation Commissioning Instrument Calibration Troubleshooting E&I QA/QC Inspection Quality Control Preventive Maintenance Breakdown Maintenance DCS ESD PLC Loop Checking Functional Testing Control Valve Testing MOV Testing Cable Installation Glanding Termination Electrical Inspection Instrumentation Inspection Punch List Management Quality Dossier ITP QCP RFI ITR NCR Documentation Field Instrumentation Control Valves MOVs Cable Laying Cable Routing Cable Dressing Cable Identification Cable Segregation Continuity Testing Insulation Resistance Testing Impulse Tubing Leak Testing Method Statements Inspection Checklists Pressure Transmitters Temperature Transmitters Flow Transmitters Level Transmitters Smart Transmitters Range Setting Positioners I/P Converters Solenoid Valves Quality Dossier Preparation P&IDs Hook-up Drawings Instrument Loop Diagrams Pressure Gauges Temperature Gauges Limit Switches Rotork AUMA AI AO DI DO Earthing Bonding
Report this Profile?