Project Technical Manager

Mass Group Holding – Romania
May 2023 - Jul 2025 · 2 years 2 months

<p>Following up the construction progress from the earlier stage with EPC contractor.<br>
Representative the owner side as technical project manager observing daily activities for gas turbine with BOP erections and other associated systems that relevant to the plant.<br>
Attending regularly the DRMs with Siemens, Avax, other BOP companies.<br>
Following the site progress as well subcontractor companies' product qualities such as (JC for HRSG, Hamon JC for cooling tower, others.).</p>

Power Plant Manager O&M (Besmaya Power Plant (5000MW)

Mass Group Holding – Iraq
Jul 2022 - Jul 2025 · 3 years

<p>Lead the full spectrum of plant operations and maintenance across a 5000MW high-capacity power plant, ensuring safe, efficient, and reliable energy production.<br>
Acted as Technical Project Leader for the integration of new GE Frame 9E.04 gas turbine units, working closely with EPC contractors to manage timelines, technical challenges, and commissioning milestones.<br>
Direct large-scale O&M teams and coordinated cross-functional collaboration between mechanical, electrical, and control departments.<br>
Oversee the implementation and optimization of CMMS systems (Maximo & ERP) to manage preventive maintenance and minimize plant downtime.<br>
Report to senior corporate leadership with data-driven insights on plant KPIs, operational efficiency, asset lifecycle, and future investment planning.</p>

Power Plant Manager O&M, Construction Director, Project Technical Manager

Mass Group Holding (MGH) · Iraq
Jul 2025

<p>Led the full spectrum of plant operations and maintenance across a 5000MW high-capacity power plant, ensuring safe, efficient, and reliable energy production.<br>
In parallel served as Construction Director for the project integration of new GE Frame 9E.04 gas turbine unit with BOP installation, commissioning and startup, working closely with EPC contractors to manage timelines, technical challenges, and commissioning milestones.<br>
Directed large-scale O&M teams and coordinated cross-functional collaboration between mechanical, electrical, and control departments.<br>
Oversee the implementation and optimization of CMMS systems (Maximo & ERP) to manage preventive maintenance and minimize plant downtime.<br>
Reported to senior corporate leadership with data-driven insights on plant KPIs, operational efficiency, asset lifecycle, and future investment planning.</p>

Construction Director – Project Technical Manager

Mass Group Holding (MGH) · Romania
Jul 2025

<p>Participated in discussions regarding the selection of the O&M contractor for the plant, providing technical input and recommendations.<br>
Followed up the construction progress from the earlier stage with EPC contractor.<br>
Represented the owner side as technical project manager observing daily activities for gas turbine with BOP erections and other associated systems that relevant to the plant.<br>
Attended regularly the DRMs with Siemens, Avax, other BOP companies.<br>
Followed the site progress as well subcontractor companies' product qualities such as JC for HRSG, Hamon JC for cooling tower, others.<br>
Participated in discussions regarding the selection of the O&M contractor for the plant, providing technical input and recommendations.</p>

Power Plant Manager O&M (Besmaya Power Plant (5000MW)

Mass Group Holding – Iraq
Jul 2025

Lead the full spectrum of plant operations and maintenance across a 5000MW high-capacity power plant, ensuring safe, efficient, and reliable energy production.

Project Technical Manager

Mass Group Holding – Romania
Jul 2025

Following up the construction progress from the earlier stage with EPC contractor, Representative the owner side as technical project manager observing daily activities for gas turbine with BOP erections and other associated systems that are relevant to the plant.

Project technical manager

Mass group holding/ energy, Besmaya combine cycle power plant 4500mw
Jul 2018 - Jul 2022 · 4 years

<p>Create detailed project plans, including objectives, timelines, budgets, and resource allocation, for technology-driven projects.<br>
Providing clear direction and assigning tasks for successful project completion.<br>
Oversee all phases of a technical project from inception to delivery, ensuring milestones are met on time and within budget.<br>
Monitor and manage project resources to ensure the project stays within its approved timeline.<br>
Establish and enforce quality standards for deliverables and oversee necessary testing and quality assurance processes.<br>
Providing regular status updates, progress reports, and addressing concerns.<br>
Lead regular team meetings to foster collaboration, address challenges, and ensure clear communication across all departments.<br>
Validate technical proposals, and resolve technical issues.<br>
Keep project documentation accurate and up-to-date, including requirements, specifications, and status updates for future reference and accountability.</p>

Project Construction Manager - Technical manager

Mass group holding/ energy, Besmaya combine cycle power plant
Jul 2018 - Jul 2022 · 4 years

<p>Created detailed project plans, including objectives, timelines, budgets, and resource allocation, for technology-driven projects.<br>
Provided clear direction and assigning tasks for successful project completion.<br>
Oversee all phases of a technical project from inception to delivery, ensuring milestones are met on time and within budget.<br>
Monitored and managed project resources to ensure the project stays within its approved timeline.<br>
Established and enforced quality standards for deliverables and oversee necessary testing and quality assurance processes.<br>
Provided regular status updates, progress reports, and addressing concerns.<br>
Led regular team meetings to foster collaboration, address challenges, and ensure clear communication across all departments.<br>
Validated technical proposals, and resolve technical issues.<br>
Kept project documentation accurate and up-to-date, including requirements, specifications, and status updates for future reference and accountability.</p>

Project technical manager

Mass group holding/ energy, Besmaya combine cycle power plant 4500mw
Jul 2018 - Jul 2022 · 4 years

Create detailed project plans, including objectives, timelines, budgets, and resource allocation, for technology-driven projects. Providing clear direction and assigning tasks for successful project completion.

Power Plant manager

Mass group holding/ energy, Besmaya combine cycle power plant 3000mw
Feb 2018 - Jul 2018 · 5 months

Power Plant manager

Mass group holding/ Besmaya combine cycle power plant
Feb 2018 - Jul 2018 · 5 months

Deputy Technical Manager & Mechanical Manager

Mass Group Holding, Besmaya combine cycle power plant 1500mw then extended to 3000mw
Jul 2016 - Feb 2018 · 1 year 7 months

<p>Representative the owner side as Mechanical Manager for Baghdad gas power station- Besmaya Project 3000 MW (8x250MW GE gas turbine frame 9FA) + (4x250MW C7 GE STG) as Combined Cycle project.<br>
Guide, lead, manage and supervise the engineering team, offering technical support and direction to overcome complex challenges, delegating tasks and ensuring optimal performance.<br>
Review and approve engineering designs, specifications, and plans to ensure they meet project requirements, safety standards, and technical accuracy.<br>
Identify, assess, and mitigate technical risks throughout the project lifecycle, implementing corrective actions when needed.<br>
Foster collaboration between various engineering disciplines (e.g., civil, mechanical, electrical, control systems).<br>
Drive a culture of continuous improvement and excellence in technical design and execution, maintaining high standards of quality and safety.<br>
Provide expert support for troubleshooting technical issues that arise during the construction or operation phases.<br>
Responsible for all QA/QC also supervising the erection & Installation as well as the commissioning activities of all mechanical works such as Heat Recovery Steam Generator from (CMI) Boilers and associated mechanical auxiliary systems and component with BOP, other main Plant Equipment (e.g. Gas& Steam Turbines, Generator from GE...etc.</p>

Deputy Construction Director& Mechanical Manager

Mass Group Holding, Besmaya combine cycle power plant 1500MW extended to 3000MW
Jul 2016 - Feb 2018 · 1 year 7 months

<p>Represented the owner side as Mechanical Manager for Baghdad- Besmaya Project 3000 MW (8x250MW GE gas turbine frame 9FA) + (4x250MW C7 GE STG) as Combined Cycle project.<br>
Guided, led, managed and supervised the engineering team, offering technical support and direction to overcome complex challenges, delegating tasks and ensuring optimal performance.<br>
Reviewed and approved engineering designs, specifications, and plans to ensure they meet project requirements, safety standards, and technical accuracy.<br>
Identified, assessed, and mitigated technical risks throughout the project lifecycle, implementing corrective actions when needed.<br>
Fostered collaboration between various engineering disciplines (e.g., civil, mechanical, electrical, control systems).<br>
Drove a culture of continuous improvement and excellence in technical design and execution, maintaining high standards of quality and safety.<br>
Provided expert support for troubleshooting technical issues that arise during the construction or operation phases.<br>
Responsible for all QA/QC also supervising the erection & Installation as well as the commissioning activities of all mechanical works such as Heat Recovery Steam Generator from (CMI) Boilers and associated mechanical auxiliary systems and component with BOP, other main Plant Equipment (e.g. Gas& Steam Turbines, Generator from GE...etc.</p>

Deputy Technical Manager & Mechanical Manager

Mass Group Holding, Besmaya combine cycle power plant 1500mw then extended to 3000mw
Jul 2016 - Feb 2018 · 1 year 7 months

Guide, lead, manage, and supervise the engineering team, offering technical support and direction to overcome complex challenges, delegating tasks and ensuring optimal performance.

Mechanical Department Lead Manager

Mass Group Holding, Sulaymaniyah combine cycle power plant 1500mw
May 2012 - Aug 2016 · 4 years 3 months

<p>Representative the owner side as Mechanical lead Manager for Sulaymaniyah power plant project for 2x250MW Combined Cycle Power Plant extension of Simple Cycle Existed Power Plant for MASS Group Holding.<br>
Managing up to 10 Engineers and Supervising with inspecting the main contractor key persons activities.<br>
Responsible for all QA/QC works as per the MDC, ITP, RFI with project design specification, supervising the erection & Installation sequences for all mechanical works such us Heat Recovery Steam Generator from (CMI 8 Units Boilers) and associated mechanical auxiliary systems and components, other main Plant Equipment (e.g. Steam Turbine Generator from GE, Air Cooled Condenser from GEA) as well as all related works.<br>
General Electric C7 Steam Turbine Installation according to GE Specification with all related commissioning activities.<br>
Supervising General Electric 321H/330H Type Generator Installation.</p>

Mechanical Construction Lead Manager

Mass Group Holding, Sulaymaniyah combine cycle power plant 1500MW + Erbil simple cycle plant extension Project 1500MW
May 2012 - Aug 2016 · 4 years 3 months

<p>Represented the owner side as Mechanical lead Manager for Sulaymaniyah power plant project for 2x250MW Combined Cycle Power Plant extension of Simple Cycle Existed Power Plant for MASS Group Holding.<br>
Managed up to 10 Engineers and supervising with inspecting the main contractor key persons activities.<br>
Responsible for all QA/QC works as per the MDC, ITP, RFI with project design specification, supervising the erection & Installation sequences for all mechanical works such us Heat Recovery Steam Generator from (CMI 8 Units Boilers) and associated mechanical auxiliary systems and components, other main Plant Equipment (e.g. Steam Turbine Generator from GE, Air Cooled Condenser from GEA) as well as all related works.<br>
Supervising General Electric C7 Steam Turbine Installation according to GE Specification with all related commissioning activities.<br>
Supervising General Electric 321H/330H Type Generator Installation.<br>
Supervising as mechanical manager all extension works for Erbil Gas power station( combined cycle project adding 2 C7 GE STG and BOP systems such as ACC, HRSG, others…).</p>

Mechanical Department Lead Manager

Mass Group Holding, Sulaymaniyah combine cycle power plant 1500mw
May 2012 - Aug 2016 · 4 years 3 months

Representative the owner side as Mechanical lead Manager for Sulaymaniyah power plant project for 2x250MW Combined Cycle Power Plant extension of Simple Cycle Existed Power Plant for MASS Group Holding.

Mechanical Department Manager (Erection)

Mass Group Holding
Dec 2011 - May 2012 · 5 months

<p>Supervision on all Mechanical activities as erection & Commissioning works of GTG7&8 in Sulaymaniyah III project 2 X GE frame 9EInstallations (units &BOP area).<br>
Oversees the installation of heavy equipment's and mechanical parts.<br>
Managing on-site teams, coordinating logistics, ensuring safety protocols.<br>
Maintaining quality standards.<br>
Resolving issues to meet project timelines and budgets.<br>
Planning and scheduling erection activities.<br>
Supervising crews, liaising with stakeholders, conducting inspections, managing subcontractors, and documenting project progress.</p>

Mechanical Manager (Construction)

Mass Group Holding- Sulaymaniyah III project
Dec 2011 - May 2012 · 5 months

<p>Supervision on all Mechanical activities as erection & Commissioning works of GTG7&8 in Sulaymaniyah III project 2 X GE frame 9EInstallations (units &BOP area).<br>
Oversees the installation of heavy equipment's and mechanical parts.<br>
Managed on-site teams, coordinating logistics, ensuring safety protocols.<br>
Maintaining quality standards.<br>
Resolving issues to meet project timelines and budgets.<br>
Planned and scheduling erection activities.<br>
Supervising crews, liaising with stakeholders, conducting inspections, managing subcontractors, and documenting project progress.</p>

Mechanical Department Manager (Erection Engineer)

Mass Group Holding- Sulaymaniyah II project 2 X 9E
Jul 2010 - Dec 2011 · 1 year 5 months

<p>Supervision on all Mechanical activities as erection & Commissioning works of GTG5&6 in Sulaymaniyah II project 2 X 9E installations (Units & BOP area).<br>
Oversees the installation of heavy equipment's and mechanical parts.<br>
Supervise day-to-day site activities related to mechanical piping and structure erection.<br>
Ensure proper alignment, levelling, and fit-up of structural components.<br>
Monitor welding, bolting, and fastening as per approved procedures and standards.<br>
Ensure compliance with erection tolerances, quality, and safety regulations.<br>
Resolving issues to meet project timelines and budgets.<br>
Planned and scheduling erection activities.</p>

Mechanical Department Manager (Erection Engineer)

Mass Group Holding
Jul 2010 - Apr 2011 · 9 months

<p>Supervision on all Mechanical activities as erection & Commissioning works of GTG5&6 in Sulaymaniyah II project 2 X 9E installations (Units & BOP area).<br>
Oversees the installation of heavy equipment's and mechanical parts.<br>
Supervise day-to-day site activities related to mechanical piping and structure erection.<br>
Ensure proper alignment, levelling, and fit-up of structural components.<br>
Monitor welding, bolting, and fastening as per approved procedures and standards.<br>
Ensure compliance with erection tolerances, quality, and safety regulations.<br>
Resolving issues to meet project timelines and budgets.<br>
Planning and scheduling erection activities.</p>

Erection Engineer in Sulaymaniyah gas power station 4 X frame 9E Installation.

Mass Global for Investment Company
Jul 2008 - Apr 2011 · 2 years 9 months

<p>Erecting & commissioning all fuel systems (gas and oil fuel).<br>
Piping welding and skids installations with inspection (hydro test with flushing).<br>
Supervisor Engineer on all oil &water tanks as per API650.</p>

Erection Engineer in Sulaymaniyah gas power station 4 X frame 9E Installation.

Mass Global for Investment Company- Sulaymaniyah gas power plant Project
Jul 2008 - Apr 2011 · 2 years 9 months

<p>Erecting & commissioning all fuel systems (gas and oil fuel) piping welding and skids installations with inspection (hydro test with flushing).<br>
Supervisor Engineer on all oil &water tanks as per API650, API653.</p>

Supervisor Engineer in Erbil gas power station 4 X 9E installation.

Mass Global for Investment Company
May 2007 - Jul 2008 · 1 year 2 months

<p>Fuel piping system erection and commissioning.<br>
Firefighting system erection and commissioning.<br>
Chimney erection and fin fan cooler erection.<br>
Commissioning work with Rotring Engineering Co. & ABB Co. on the oil treatment and all the fuel skids.<br>
Supervision all mechanical works related to building the fuel oil and water tanks as per API650.</p>

Mechanical Supervisor Engineer in Erbil gas power station 4 X 9E installation.

Mass Global for Investment Company- Erbil gas power Plant Project
May 2007 - Jul 2008 · 1 year 2 months

<p>Fuel piping system erection and commissioning.<br>
Firefighting system erection and commissioning.<br>
Chimney erection and fin fan cooler erection, commissioning work with Rotring Engineering Co. & ABB Co. on the oil treatment and all the fuel skids.<br>
Supervision all mechanical works related to building the fuel oil and water tanks as per API650. API653.</p>

Maintenance Engineer.

Mulla Abdulla Gas Power Plant, Kirkuk
Jun 2006 - May 2007 · 11 months

<p>Maintenance and Rehabilitation on Turbine FRAME – 5.<br>
Maintenance and Rehabilitation on Turbine FRAME - 6.<br>
Generator rotor replacement for Turbine FRAME – 6.<br>
Maintenance works for all Auxiliaries, I/C Engine (Diesel) and the firefighting system in the station.</p>

Maintenance Engineer

Mulla Abdulla Gas Power Plant, Kirkuk · Kirkuk
Jun 2006 - May 2007 · 11 months

<p>Maintenance and rehabilitation on Turbine FRAME – 5.<br>
Maintenance and rehabilitation on Frame 6 Gas Turbines (CMEC/GE technology).<br>
Generator rotor replacement for Turbine FRAME – 6.<br>
Maintenance works for all Auxiliaries, I/C Engine (Diesel) and the firefighting system.</p>

Pumps Dept. Manager (Maintenance).

Baiji thermal power plant (Salah Al-din)
May 2002 - Jun 2006 · 4 years 1 month

<p>Maintenance and refurbishment of all rotating equipment’s pumps and compressors.<br>
Maintenance and refurbishment of water intake pumps (lifting & circulating pumps, Condensate water pumps, bearing cooling pumps, residual oil pumps, Diesel oil pumps, crude oil pumps, washing pumps, firefighting pumps, hydraulic pumps, Oil free air Compressors (Atlas Copco, ZR3, ZR110, ZR160), Air dryers.<br>
Maintenance and refurbishment of FD_Fans (Forced Draft Fans), GR Fans (Gas Recirculation Fans) system in the station.</p>

Pumps &Auxiliary Dept. Manager (Maintenance)

Baiji thermal power plant (Salah Al-din) Ansaldo 1200MW · Salah Al-din
May 2002 - Jun 2006 · 4 years 1 month

<p>Maintenance and refurbishment of all rotating equipment’s pumps and compressors.<br>
Maintenance and refurbishment of water intake pumps (lifting & circulating pumps, Condensate water pumps, bearing cooling pumps, residual oil pumps, Diesel oil pumps, crude oil pumps, washing pumps, firefighting pumps, hydraulic pumps).<br>
Maintenance and refurbishment of Oil free air Compressors (Atlas Copco, ZR3, ZR110, ZR160).<br>
Maintenance and refurbishment of Air dryers.<br>
Maintenance and refurbishment of FD_Fans (Forced Draft Fans), GR Fans (Gas Recirculation Fans) system in the station.</p>

Maintenance Engineer.

Electrical Machinery Engineering (Baghdad& Mosul) in military
Jul 2000 - Feb 2002 · 1 year 7 months

<p>Maintenance and refurbish of I/C engines as well as the generators.</p>

Maintenance Engineer

Electrical Machinery Engineering (Baghdad& Mosul) in military · Baghdad& Mosul
Jul 2000 - Feb 2002 · 1 year 7 months

<p>Maintenance and refurbishment of I/C engines as well as the generators.</p>

Construction& Projects Manager

Leading Engineering Services Company · Iraq
Nov 2007 - Jul 2025 · 17 years 8 months

<p>Directed the Construction and technical execution of strategic upgrades of power plant systems, ensuring seamless integration through systems.</p><p> Conducted technical assessments and reviewing the project.</p><p> Ensured safe, reliable, and efficient operation by overseeing EPC and contractors’ work and site inspections.</p><p> Monitored project progress and ensured works meet project specifications and timelines.</p>

Skills

Project Management Construction Power Plant Operations and Maintenance EPC Project Leadership QA/QC Mechanical Erection Commissioning CMMS Maximo ERP Project Planning Budgeting Resource Allocation Technical Project Management Team Leadership Communication Mechanical Supervision Piping Erection Structural Erection Fabrication Construction Drawing Construction Standards RFI ITP MDC ASME API AISC NDT Welding Inspection Maintenance Troubleshooting Microsoft Word Microsoft Excel Construction Management Plant Operations and Maintenance EPC EPCM Startup Stakeholder Management Preventive Maintenance Corrective Maintenance Fuel Oil Systems Gas Systems Raw Water Treatment Systems Demineralized Water Treatment Systems Firefighting Systems Air Compressor Systems Mechanical Workshop Management Welding Procedures HSE Microsoft Office Excel Word Project Scheduling Executive Leadership Cross-cultural Communication Conflict Resolution