Job Purpose
Identify evaluate co-ordinate and execute process improvements and process engineering related activities for plant improvement and the Capex projects within the schedule to meet the desired improvements. All activities related to Energy Conservation.
Job Context & Major Challenges
Job Context :
Hirmi Cement Works has the production capacity of 2.75 million tonne per annum. This kiln that started producing in 1994 is one of the largest clinker producers for its size of kiln.
The plant is equipped with clinker loading system apart from rake & rail cement loading systems to support its grinding units at Jharsuguda Orissa and at Durgapur West Bengal.
The plant operates on technology by M/s F L Smidth Denmark; who have also supplied major equipment of the plant including the two Atox-45 mills.
The plant also has a 5x6MW Captive Power Plant with M/s Wartsila Finland supplied DG sets.
Right from Limestone Crusher to Packing plant operations are supported by state of art Control & Automation. Energy saving measures are of prime concern and systems conserve energy has been installed. The Plant Energy Monitoring system helps monitoring the energy usage and also helps identifying areas of improvement. Major challenges:
ascertain process viability / adaptability in retrofitting projects.
targeted performance by adequate evaluation of the process engineering related to up-gradation schemes for new generation schemes where back up data/performance are not known
mechanical jobs in the plant breakdown analysis MAP etc. and support plant in trouble shooting to improve plant availability
Key Result Areas
- MUST BE LEVEL 2 VIBRATION ANALYST.
- MUST BE LEVEL 1 / 2 IN UT / MPT
- HANDS ON EXPERIENCE OF LASER ALIGNMENT
- SHOULD BE ABLE TO UNDERSTAND WDA REPORT AND IMPLEMENT IT IN PLANT
- WELL CONVERSANT WITH ROTOR DYNAMICS OF FAN GEAR BOX PUMPS AND COMPRESSORS
- IN DEPTH UNDERSTANDING OF BRGS ASSEMBLY DISMENTALING AND ITS LUBRICATION
- WELL CONVERSANT WITH MS EXCEL AND POWER POINT
- ABILITY TO CARRY OUT SINGLE PLANE AND TWO PLANE DYNAMIC BALANCING OF FAN.
- SHOULD BE WELL CONVERSANT WITH SHUT DOWN MANAGEMENT AND COORDINATION.
- SHOULD HAVE FARE KNOWLEDGE OF SAP-PM MODULE
Required Experience:
IC
Job PurposeIdentify evaluate co-ordinate and execute process improvements and process engineering related activities for plant improvement and the Capex projects within the schedule to meet the desired improvements. All activities related to Energy Conservation.Job Context & Major ChallengesJob Cont...
Job Purpose
Identify evaluate co-ordinate and execute process improvements and process engineering related activities for plant improvement and the Capex projects within the schedule to meet the desired improvements. All activities related to Energy Conservation.
Job Context & Major Challenges
Job Context :
Hirmi Cement Works has the production capacity of 2.75 million tonne per annum. This kiln that started producing in 1994 is one of the largest clinker producers for its size of kiln.
The plant is equipped with clinker loading system apart from rake & rail cement loading systems to support its grinding units at Jharsuguda Orissa and at Durgapur West Bengal.
The plant operates on technology by M/s F L Smidth Denmark; who have also supplied major equipment of the plant including the two Atox-45 mills.
The plant also has a 5x6MW Captive Power Plant with M/s Wartsila Finland supplied DG sets.
Right from Limestone Crusher to Packing plant operations are supported by state of art Control & Automation. Energy saving measures are of prime concern and systems conserve energy has been installed. The Plant Energy Monitoring system helps monitoring the energy usage and also helps identifying areas of improvement. Major challenges:
ascertain process viability / adaptability in retrofitting projects.
targeted performance by adequate evaluation of the process engineering related to up-gradation schemes for new generation schemes where back up data/performance are not known
mechanical jobs in the plant breakdown analysis MAP etc. and support plant in trouble shooting to improve plant availability
Key Result Areas
- MUST BE LEVEL 2 VIBRATION ANALYST.
- MUST BE LEVEL 1 / 2 IN UT / MPT
- HANDS ON EXPERIENCE OF LASER ALIGNMENT
- SHOULD BE ABLE TO UNDERSTAND WDA REPORT AND IMPLEMENT IT IN PLANT
- WELL CONVERSANT WITH ROTOR DYNAMICS OF FAN GEAR BOX PUMPS AND COMPRESSORS
- IN DEPTH UNDERSTANDING OF BRGS ASSEMBLY DISMENTALING AND ITS LUBRICATION
- WELL CONVERSANT WITH MS EXCEL AND POWER POINT
- ABILITY TO CARRY OUT SINGLE PLANE AND TWO PLANE DYNAMIC BALANCING OF FAN.
- SHOULD BE WELL CONVERSANT WITH SHUT DOWN MANAGEMENT AND COORDINATION.
- SHOULD HAVE FARE KNOWLEDGE OF SAP-PM MODULE
Required Experience:
IC