Description- Liaise with VME Team vehicle operations engineering teams and suppliers.
- Lead the Stamping Single Panel feasibility process following the required metrics and timings for each loop
- Develop 2D/3D Stamping Process
- Raise Purchase Orders etc. as required for Tooling and Facilities.
- Lead Die Design Reviews tooling reviews and buyoff activities.
- Ensuring all tools being developed to reach maximum SPM (ECR) overcoming all possible interference that can be found.
- Support during launch phase to ensure Engineered Cycle Rate (ECR) achieved prior production handover.
- Compile and report LQOS (Launch Quality Operating System) metrics attend all launch meeting cadences
- Buy off tooling at supplier site ensure timely in plant delivery timing allowing for robust launch and early PSW completion knowledge of FMEA/PFMEA methodologies and their application
- Assist all Launch and Sheet Metal quality activities.
- Support to complete PSW process and acquire required customer acceptance
- Work with both facility and tooling team both within to ensure all launch metrics are delivered.
- Support to Identify and analyze deviations from established company quality standards.
- Conduct root cause investigations and prevent re-occurrences
- Support PVT & TVM activities as required
- Develop and train LNE teams on all sites to be capable of: Overcoming issues such as splits and wrinkles
- Improving FPA to better-than-expected levels
PERFORMANCE MEASURES/ SUCCESS CRITERIA
- Ensure project on-time delivery
- Develop and deliver projects to budget and cost delivery
- Ensure component capability and quality is achieved to standards and specifications
Responsibilities- Liaise with VME Team vehicle operations engineering teams and suppliers.
- Lead the Stamping Single Panel feasibility process following the required metrics and timings for each loop
- Develop 2D/3D Stamping Process
- Raise Purchase Orders etc. as required for Tooling and Facilities.
- Lead Die Design Reviews tooling reviews and buyoff activities.
- Ensuring all tools being developed to reach maximum SPM (ECR) overcoming all possible interference that can be found.
- Support during launch phase to ensure Engineered Cycle Rate (ECR) achieved prior production handover.
- Compile and report LQOS (Launch Quality Operating System) metrics attend all launch meeting cadences
- Buy off tooling at supplier site ensure timely in plant delivery timing allowing for robust launch and early PSW completion knowledge of FMEA/PFMEA methodologies and their application
- Assist all Launch and Sheet Metal quality activities.
- Support to complete PSW process and acquire required customer acceptance
- Work with both facility and tooling team both within to ensure all launch metrics are delivered.
- Support to Identify and analyze deviations from established company quality standards.
- Conduct root cause investigations and prevent re-occurrences
- Support PVT & TVM activities as required
- Develop and train LNE teams on all sites to be capable of: Overcoming issues such as splits and wrinkles
- Improving FPA to better-than-expected levels
PERFORMANCE MEASURES/ SUCCESS CRITERIA
- Ensure project on-time delivery
- Develop and deliver projects to budget and cost delivery
- Ensure component capability and quality is achieved to standards and specifications
Qualifications- Bachelors degree in mechanical engineering or relate.
- Extensive experience 5 years in stamping and tool development
- Experience working with Stamping Core Class A Panels.
- Knowledge of CAD systems (AutoCAD /Catia/3DX/Tebis /Vismockup)
- Solid Technical knowledge - 2D / 3D drawings (Facilities and Stamping dies)
KNOWLEDGE SKILLS and ABILITIES (KSA):
- Strong trade and hands on background experience.
- Exposure to both advanced engineering programs and launch.
- Prior experience in stamping production and or tooling manufacture.
- Self-Starter / Initiative
- Communication Skills
- English proficiency (both written and spoken)
- Team Player
- Ability to learn and adapt
- Positive and find a way attitude
- Solid technical background
- Team leadership
- Ford Systems / Procedures (WERS / TCE / Confluence / WDX /
- FPA / PSW / Locators strategy / ..)
Required Experience:
IC
DescriptionLiaise with VME Team vehicle operations engineering teams and suppliers.Lead the Stamping Single Panel feasibility process following the required metrics and timings for each loopDevelop 2D/3D Stamping ProcessRaise Purchase Orders etc. as required for Tooling and Facilities.Lead Die Desig...
Description- Liaise with VME Team vehicle operations engineering teams and suppliers.
- Lead the Stamping Single Panel feasibility process following the required metrics and timings for each loop
- Develop 2D/3D Stamping Process
- Raise Purchase Orders etc. as required for Tooling and Facilities.
- Lead Die Design Reviews tooling reviews and buyoff activities.
- Ensuring all tools being developed to reach maximum SPM (ECR) overcoming all possible interference that can be found.
- Support during launch phase to ensure Engineered Cycle Rate (ECR) achieved prior production handover.
- Compile and report LQOS (Launch Quality Operating System) metrics attend all launch meeting cadences
- Buy off tooling at supplier site ensure timely in plant delivery timing allowing for robust launch and early PSW completion knowledge of FMEA/PFMEA methodologies and their application
- Assist all Launch and Sheet Metal quality activities.
- Support to complete PSW process and acquire required customer acceptance
- Work with both facility and tooling team both within to ensure all launch metrics are delivered.
- Support to Identify and analyze deviations from established company quality standards.
- Conduct root cause investigations and prevent re-occurrences
- Support PVT & TVM activities as required
- Develop and train LNE teams on all sites to be capable of: Overcoming issues such as splits and wrinkles
- Improving FPA to better-than-expected levels
PERFORMANCE MEASURES/ SUCCESS CRITERIA
- Ensure project on-time delivery
- Develop and deliver projects to budget and cost delivery
- Ensure component capability and quality is achieved to standards and specifications
Responsibilities- Liaise with VME Team vehicle operations engineering teams and suppliers.
- Lead the Stamping Single Panel feasibility process following the required metrics and timings for each loop
- Develop 2D/3D Stamping Process
- Raise Purchase Orders etc. as required for Tooling and Facilities.
- Lead Die Design Reviews tooling reviews and buyoff activities.
- Ensuring all tools being developed to reach maximum SPM (ECR) overcoming all possible interference that can be found.
- Support during launch phase to ensure Engineered Cycle Rate (ECR) achieved prior production handover.
- Compile and report LQOS (Launch Quality Operating System) metrics attend all launch meeting cadences
- Buy off tooling at supplier site ensure timely in plant delivery timing allowing for robust launch and early PSW completion knowledge of FMEA/PFMEA methodologies and their application
- Assist all Launch and Sheet Metal quality activities.
- Support to complete PSW process and acquire required customer acceptance
- Work with both facility and tooling team both within to ensure all launch metrics are delivered.
- Support to Identify and analyze deviations from established company quality standards.
- Conduct root cause investigations and prevent re-occurrences
- Support PVT & TVM activities as required
- Develop and train LNE teams on all sites to be capable of: Overcoming issues such as splits and wrinkles
- Improving FPA to better-than-expected levels
PERFORMANCE MEASURES/ SUCCESS CRITERIA
- Ensure project on-time delivery
- Develop and deliver projects to budget and cost delivery
- Ensure component capability and quality is achieved to standards and specifications
Qualifications- Bachelors degree in mechanical engineering or relate.
- Extensive experience 5 years in stamping and tool development
- Experience working with Stamping Core Class A Panels.
- Knowledge of CAD systems (AutoCAD /Catia/3DX/Tebis /Vismockup)
- Solid Technical knowledge - 2D / 3D drawings (Facilities and Stamping dies)
KNOWLEDGE SKILLS and ABILITIES (KSA):
- Strong trade and hands on background experience.
- Exposure to both advanced engineering programs and launch.
- Prior experience in stamping production and or tooling manufacture.
- Self-Starter / Initiative
- Communication Skills
- English proficiency (both written and spoken)
- Team Player
- Ability to learn and adapt
- Positive and find a way attitude
- Solid technical background
- Team leadership
- Ford Systems / Procedures (WERS / TCE / Confluence / WDX /
- FPA / PSW / Locators strategy / ..)
Required Experience:
IC
View more
View less