Frameworkers

EmpireServices

Not Interested
Bookmark
Report This Job

profile Job Location:

Birmingham - USA

profile Monthly Salary: Not Disclosed
Posted on: 30+ days ago
Vacancies: 1 Vacancy
The job posting is outdated and position may be filled

Job Summary

1) Measure and mark cutting lines on materials using ruler pencil chalk and marking gauge.
2) Follow established safety rules and regulations and maintain a safe and clean environment.
3) Verify trueness of structure using plumb bob and level.
4) Shape or cut materials to specified measurements using hand tools machines or power saw.
5) Study specifications in blueprints sketches or building plans to prepare project layout and determine dimensions and materials required.
6) Assemble and fasten materials to make framework or props using hand tools and wood screws nails dowel pins or glue.

7) Build or repair cabinets doors frameworks floors and other wooden fixtures used in buildings using woodworking machines carpenters hand tools and power tools.
8) Erect scaffolding and ladders for assembling structures above ground level.
910) Install structures and fixtures such as windows frames floorings and trim or hardware using carpenters hand and power tools.
11) Select and order lumber and other required materials.
12) Maintain records document actions and present written progress reports.
13) Finish surfaces of woodwork or wallboard in houses and buildings using paint hand tools and paneling.
14) Prepare cost estimates for clients or employers.
15) Arrange for subcontractors to deal with special areas such as heating and electrical wiring work.
16) Inspect ceiling or floor tile wall coverings siding glass or woodwork to detect broken or damaged structures.
17) Work with and/or remove hazardous material.
18) Construct forms and chutes for pouring concrete.
19) Cover subfloors with building paper to keep out moisture and lay hardwood parquet and wood-strip-block floors by nailing floors to subfloor or cementing them to mastic or asphalt base.
20) Fill cracks and other defects in plaster or plasterboard and sand patch using patching plaster trowel and sanding tool.
21) Apply shock-absorbing sound-deadening and decorative paneling to ceilings and walls. ) Remove damaged or defective parts or sections of structures and repair or replace using hand tools

1) Measure and mark cutting lines on materials using ruler pencil chalk and marking gauge.2) Follow established safety rules and regulations and maintain a safe and clean environment.3) Verify trueness of structure using plumb bob and level.4) Shape or cut materials to specified measurements using h...
View more view more