drjobs SH Effic Mon MIS Tp an EM

SH Effic Mon MIS Tp an EM

Employer Active

1 Vacancy
drjobs

Job Alert

You will be updated with latest job alerts via email
Valid email field required
Send jobs
Send me jobs like this
drjobs

Job Alert

You will be updated with latest job alerts via email

Valid email field required
Send jobs
Job Location drjobs

Singrauli - India

Monthly Salary drjobs

Not Disclosed

drjobs

Salary Not Disclosed

Vacancy

1 Vacancy

Job Description

Job Purpose

Job Purpose Description

Job Context & Major Challenges

JOB CONTEXT:

Mahan Captive Power has an installed capacity of 900 MW (150 MW x 6) 6 TG Sets & 6 Pulverised fuel boilers of 510 TPH steaming capacity While supplying power to highly power-intensive aluminium smelter any kind of outage & unscheduled outage cannot be afforded also power generation through CPP Units should be at optimum cost. To achieve this following activities are to be done on regular basis.

Plant Performance & MIS -The job involves overall planning monitoring execution and coordination with O & M dept to identify & analysis the loss areas & suggestion for corrective action to existing plants equipment. To identify new energy saving projects & to carry out technical studies for performance improvement & feasibility for adoption for new technology with consideration of quality Cost & Eco friendly with environment.

JOB CHALLENGES:
1)The Job demands Competency in field of engineering technical & Management competency such as knowledge of latest technology of Mechanical equipments & Business excellence tools & techniques related to Power plant.
2)Coordination with external & internal Coal Audit team for compliance.
3)Time management to deliver excellence in coal as well as in plant performance deviation analysis.
4)The jobs latest tools instrument and resources like manpower for challenging work for plant performance
5)Skill enhancement required on regular basis to cope up with latest technology.
6)Skill of managing O &M dept. For maintaining conducive and safe environment in work area.
7)Management skills required to implement at ground level.
8)Co-ordination & Negotiation skills to handle to Man Material Machine interface.

Key Result Areas

KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)KRA11. Business Excellence through improvement in Plant Performance- Boiler & Aux. TG & Aux. BOP CHP AHP and miscellaneous1)Performance analysis and recommendations on the following in order that optimum CPP performance may be achieved:
a)Shut down
b)Critical equipment performance
c)Best efficiency point for all units
2)Verifying post maintenance performance evaluation for these critical machines
3)Pump performance of BOP Area.
4)Audit of aux. consumption
5)High consumption of water monitored through water balance
6)Various studies for plant performance (O&M) improvement project
7)Study of SOP deviation & new technology to optimize the process.
8) CHP & AHP Aux. ConsumptionKRA22. Cost1)Partnering operating and maintenance teams in cost saving initiatives through suggestions for change without compromising the efficiencyKRA33) Customer1)Ensuring implementation of all outcomes of trip analysis and FIR analysis.
2)Generating periodic MIS reports pertaining to power generation reports equipment performance report pre & post overhauling performance report and improvement initiatives being undertaken across the units water and coal consumption. plant and equipment performance
3)Influencing internal customers to take corrective action to on basis of the reports to improve efficiencies
4)Minimising response time in giving data to internal customersKRA44. Cash1)Recommendations for improvement in process parameters like boiler efficiency PHR water consumption oil and coal consumption etc.
2)Driving energy management throughout Aditya for Reduction in auxiliary power consumption.KRA55. Safety1)Partnering in implementing Safety standards and safety related training for team including contractual workmen deployed in field testing
2)By constant counseling to the people.
3)Tool box talks before applying the PTW
4)Passing on the messages down to the working level. Ensure Safety of man machine & materials at site.
5)Ensure compliance of organizations safety & environment policy.
6)Ensuring use of PPE by the workmen.
7)Guideline for adopting safety norms while working at site.
8)Establishing the Housekeeping standards and monitor the implementation of the same in the work area.KRA66. Cost1)Partnering operating and maintenance teams in cost saving initiatives through suggestions for change without compromising the efficiencyKRA77. Customer1)Ensuring implementation of all outcomes of trip analysis and FIR analysis.
2)Generating periodic MIS reports pertaining to power generation reports equipment performance report pre & post overhauling performance report and improvement initiatives being undertaken across the units water and coal consumption. plant and equipment performance
3)Influencing internal customers to take corrective action to on basis of the reports to improve efficiencies
4)Minimising response time in giving data to internal customersKRA88. Cash1)Recommendations for improvement in process parameters like boiler efficiency PHR water consumption oil and coal consumption etc.
2)Driving energy management throughout Aditya for Reduction in auxiliary power consumption.KRA99. People development and engagement1)Monitoring and improving performance of team members
2)Ensuring competency building through training need identification training initiatives to enhance technical and behavioral competencies
3)Monitoring intake and deployment of appropriately trained contractual workforce and ensuring their continuous training and wellbeing as per company guidelines.

Required Experience:

Manager

Employment Type

Full Time

Company Industry

About Company

Report This Job
Disclaimer: Drjobpro.com is only a platform that connects job seekers and employers. Applicants are advised to conduct their own independent research into the credentials of the prospective employer.We always make certain that our clients do not endorse any request for money payments, thus we advise against sharing any personal or bank-related information with any third party. If you suspect fraud or malpractice, please contact us via contact us page.