Employer Active
Job Alert
You will be updated with latest job alerts via emailJob Alert
You will be updated with latest job alerts via emailNot Disclosed
Salary Not Disclosed
1 Vacancy
Lighting the way ahead together. We are committed 24/7 365 days a year to a safe and reliable supply of electricity now and in the future. That is the world of TenneT. As a leading European grid operator we design build maintain and operate the high-voltage grid in the Netherlands and large parts of Germany and play a key role in the energy transition. With 23500 kilometres of high-voltage connections on land and at sea and almost 5000 employees we ensure the daily power supply of more than 42 million end users. TenneT has so many innovative projects in the pipeline now and in the coming years that we are always looking for motivated professionals.
For TenneT we are looking for a:
Work preparation location security (HV station) / physical security
The Bay Replacement Program (BRP):
TenneT is facing a major replacement task of 110kV and 150 kV stations in the Netherlands. Of these approximately 150 units must be replaced/renewed because they are approaching the end of their lifespan. In addition the replacement must respond to the energy transition and the capacity of many stations must be increased. This is a challenging task that can only be achieved with an innovative approach.
The approach consists in a nutshell of standardization and modularization. The design of the stations is standardized and the standardized modules are mass-produced in a factory. The work at the location of the high-voltage station is minimized with this approach. Only in this way can many stations be converted in a relatively short time at optimal costs.
The approach outlined is very different from what is currently customary. That is why six stations are now being realised as Proof of Concept. This will test the feasibility of the new concept. Following the Proof of Concept phase the Test phase is currently being prepared. This is a next group of 12 stations that will be built following the Proof of Concept stations. The aim of this test phase is to further test the feasibility of the approach with other market parties and to further optimise it. Both the Proof of Concept stations and the Test phase stations are being realised by multiple Contractors based on UAV-GC Design and construct contracts.
Full Time