drjobs TPP BOA Jrasst Engineer

TPP BOA Jrasst Engineer

Employer Active

1 Vacancy
drjobs

Job Alert

You will be updated with latest job alerts via email
Valid email field required
Send jobs
Send me jobs like this
drjobs

Job Alert

You will be updated with latest job alerts via email

Valid email field required
Send jobs
Job Location drjobs

Raipur - India

Monthly Salary drjobs

Not Disclosed

drjobs

Salary Not Disclosed

Vacancy

1 Vacancy

Job Description


Work Location: Rawan Cement Works

No Accommodation is available in Township

Job Band / Grade: S2/S3/S4/S5

Designation: Supervisor / Senior Supervisor / Junior Officer / Junior Engineer / Assistant Officer / Assistant Engineer

Education: Diploma in Mechanical & Firstclass Boiler attendant Certification

Minium Experience Required: 38 Years


Skills Required: Mandatory Skills of DCS operation of CFBC & WHRS Boilers and Turbine. Hands on Experience of Boiler Startup and shutdown. DM/RO Water Quality Knowledge required. Knowledge of Safety & statutory compliance at workplace


Job Purpose

To ensure safe & smooth TPP Field operation while start up shutdown of boiler and turbine along with economic uninterrupted and quality power generation by coordination with other agencies in the plant to rectify the abnormalities and report to Desk Engineer and Shift Incharge.

Job Context & Major Challenges

Job Context:
UltraTech Cement Ltd. is the largest manufacturer of grey cement Ready Mix Concrete (RMC) and white cement in India. It is also one of the leading cement producers globally. The company has a consolidated capacity of 132.45 Million Tones Per Annum (MTPA) of grey cement. UltraTech Cement has 23 integrated plants 1 Clinkerization plant 27 grinding units and 7 bulk terminals post the Century merger. Its operations span across India UAE Bahrain Bangladesh and Sri Lanka.
UltraTech Rawan Cement plant started its Line 1 operation in early 90s with the capacity of 1 MTPA commissioned in March 1995 as Grasim Cement Unit. This was setup to capture the Eastern Cluster deficit market. In March2013 Line 2 Clinkerization unit was commissioned along with clinker bulk loading facility currently consolidated capacity of Rawan Cement is 6.5 MTPA. Rawan Cement Works also has Captive Thermal Power Plant with a total capacity of 55 MW Waste Heat Recovery System with capacity of 20.4 MW and 10.8 MW Solar Power Plant. The plant has a state of art technology viz. Vertical Roller Mills from Loesch Germany for grinding limestone and coal Kiln and cooler from L&T/FLS Denmark CombiGrinding Cement Mill with Roller Press from KHD Germany Finish Grinding Slag Grinding Roller Press from Krupp Polysius Germany Cross belt analyser from Gamma Metrics USA for online analysis of Limestone XRay analyser Cem Scanner from FLS Denmark.
As the largest cement producer in India we continually strive to play a key role in finding effective and responsible ways to preserve the environment a Cement Sustainability Initiative. We as a company are committed to improving our sustainability footprint in the identified areas of waste management energy reduction water conservation biodiversity management afforestation and emission reduction which are relevant to the cement industry.
Major Challenges:
Operating TPP with least possible auxiliary and PHR even at low PLF and higher load fluctuations for providing uninterrupted power to cement plant without grid power availibility.
Supervise desk operations and provide effective decision for safe start up operation & shutdown in any abnormal conditions by coordination with cross functional departments.
To run boilers as per IBR statutory requirements and GPCB norms with all WCM & ISO practices.

Key Result Areas


KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)KRA1Plant operation:
Execute all Field operational activities for smooth operation of all equipments in turn to give uninterrupted & quality power to customer.Plan and execute the field operation of various equipments of boiler in oder to ensure smooth safe and reliable operation of the same.
Close coordination with CCR for any specific operation and reporting the same on immediate basis.
To execute and ensure zero non compliance of safety by self as well as all workmen at the field during any given jobs.
Handling any emergency situation by effective coordination with CCR and ensuring field operation activities of boiler safely and smoothly.
To plan and execute activities related to annual boiler hydro test as per statutoty requirement.
Operation of bed ash cooler and flyash/bed ash system from the field in contact with CCR.
Field of activities during startstop of the plant.KRA2Shift management
of all operational activities & housekeepingSample collection of coal fly ash bed ash water and steam and ensuring timely analysis of the same.
Root cause analysis of the problems and taking part in finding solutions of the same effectively.
Regular round in each shift for complete boiler area and ensuring normal operating conditions by correcting any issues.
Loading and unloading of lime stone in boiler bunkers through bulkers.
Ensure filling of Field Operators Check list & Log sheets and regular verification of datas.
Ensure maintaining every equipments daily status of CLIT Check list healthy.

Ensure House keeping of Boiler Turbine & BOP Area.KRA3SHE (Safety Health & Environment) along with Sustainability initiativesEnsuring 100 compliance of all safety standards and all applicable recommendations related to their concerned area.
Timely conducting scheduled SO round and reporting of accidents incidents and near misses on occurrences in the area of concern in system.
To conduct daily Tool Box Talk as schedule and before start the job any critical job along with SWP
Active participation in safety training safety sub committees standard champions meeting and any safety event
Ensure good housekeeping limited use of power no leakage of water oil air etc and reporting concerned if any abnormalities for corrective action
Adhering of all safety precautions on the site and off the site
Replicating good practice for saving environment for long run sustainability and creating awareness among manpower to save guard natural resources.KRA4System Management
(Effective implementation of all IMS and other systems requirements through involvement for continuous improvement in plant working condition & quality standards)Ensuring proper safety precautions for working at height especially in boilers and sea water pump maintenance for
sustenance of zero accident.
To implement improvement project to reduce repetitive problems/breakdown or losses.
Timely submission of Kaizen OPL Good to fine suggestion on system
Developing and sustaining Model area in respective sections
100 active participation in respective KFA & GRT meetings and giving inputs related to bring new technology innovation and improvements towards productivity.
To know about IMS and other systems requirement and documents for NonConformity in section during internal and external audits or assessments.
Implementation of critical spares & consumable SOP without any defilement
Identify & arrange rectification of leakage points/unsafe points along with monitor & take corrective action for emission levels.


Please go through above job description thoroughly and share your basic details only if your profile is relevant to position requirement this will help us to screen your candidature:Click here to share some basic details

Employment Type

Full Time

About Company

Report This Job
Disclaimer: Drjobpro.com is only a platform that connects job seekers and employers. Applicants are advised to conduct their own independent research into the credentials of the prospective employer.We always make certain that our clients do not endorse any request for money payments, thus we advise against sharing any personal or bank-related information with any third party. If you suspect fraud or malpractice, please contact us via contact us page.