Turnaround Planning Engineer
ملخص الوظيفة
This role is responsible for developing scope of work based on site inputs and inspection reports and for
preparing budgetary estimates for materials and service requisitions. The role works closely with maintenance teams technical teams facility maintenance and contractors to maintain and update the master plan for both Turnaround and non-Turnaround activities while coordinating with HSE Logistics and other relevant disciplines prior to execution.
Develop and define the Turnaround scope including contract requirements in line with agreed
milestones and ensure preparation of work packs personnel mobilization plans and execution strategies for shutdown and Turnaround windows.
Act as focal point for technical inputs related to tendering technical evaluations and contract
presentations within the assigned area.
Establish maintain and report the master planning schedule across all phases of the Turnaround
including progress monitoring reporting and implementation of corrective actions while controlling
scope changes through a structured process.
Initiate and manage all required work orders and activities in SAP systems with realistic duration
estimates ensuring timely availability of resources materials and spare parts.
Coordinate closely with all stakeholders including contractors to ensure proper schedule development in Primavera effective resource allocation and leveling and alignment of execution strategies and job priorities. Participate in and facilitate coordination meetings across all disciplines for overall planning scope challenge contractor alignment and closeout activities.
Ensure implementation of all approved recommendations and actions for the upcoming Turnaround
within the assigned area. Integrate all scopes - maintenance projects inspection operations and support functionsinto a single unified execution plan.
Develop and maintain a controlled master worklist ensuring all scope changes are managed through a
formal change management process.
Lead scope challenge and optimization efforts to ensure inclusion of only justified and critical activities.
Ensure scope development is comprehensive incorporating inputs from inspection findings asset
integrity requirements risk assessments engineering studies past performance lessons learned and
operational constraints.
Perform detailed scope refinement including manpower materials tools execution methodology and
contingency planning.
Plan and manage procurement by identifying long-lead and short-lead materials in alignment with
schedule requirements. Develop and maintain integrated schedules including critical path identification and management of near-critical activities impacting Turnaround duration.
Conduct job interface and clash analysis to ensure safe and efficient execution of simultaneous
all phases pre-
عن الشركة
Founded in 2004 in Rome by Engineer Giuseppe Bellantoni, ISS International SpA - Integrated Services Solution immediately distinguishes itself within both Energy and Oil & Gas sectors for the wide range of integrated solutions, highly specialized in the support of technical areas, man ... اعرض المزيد