Vacancy Created: 12/03/2026
To apply for this role please call Brad on or alternatively you can send your CV and competencies toemailprotected
AWC Staff Services are looking for a Gang of 6 for work with their client in the North Westdelivering essential infrastructure projects within the UK Water sector.
4 x water operatives(including grab driver and mate for reinstatementand capable of welding pipe connections)
1 x working supervisor
1 x support driver
Plant
1.5 T excavator for excavatingpit at either end of the slip lining sections and also excavatingservice transfers. (generally no deeperthan 1.5 m).
Grab may also be required.
Pushing machine may be required to push/pull pipe insertion.
Hotbox on larger schemes for reinstatement but you may want to manually lay the top and roll on this scheme.
Tools
Generaltools welding machine/ winch etc.
Barriers signage pipe and fittings to be provided by the client.
Pipe to be collected from wigan depot fittings to be collected from worsley depot (pre palleted up as per fittings list on drawings).
Start: April 2026
Duration: Ongoing
Rate: Dependent on roles enquire for more information
Vacancy Created: 12/03/2026To apply for this role please call Brad on or alternatively you can send your CV and competencies toemailprotectedAWC Staff Services are looking for a Gang of 6 for work with their client in the North Westdelivering essential infrastructure projects within the UK Water se...
Vacancy Created: 12/03/2026
To apply for this role please call Brad on or alternatively you can send your CV and competencies toemailprotected
AWC Staff Services are looking for a Gang of 6 for work with their client in the North Westdelivering essential infrastructure projects within the UK Water sector.
4 x water operatives(including grab driver and mate for reinstatementand capable of welding pipe connections)
1 x working supervisor
1 x support driver
Plant
1.5 T excavator for excavatingpit at either end of the slip lining sections and also excavatingservice transfers. (generally no deeperthan 1.5 m).
Grab may also be required.
Pushing machine may be required to push/pull pipe insertion.
Hotbox on larger schemes for reinstatement but you may want to manually lay the top and roll on this scheme.
Tools
Generaltools welding machine/ winch etc.
Barriers signage pipe and fittings to be provided by the client.
Pipe to be collected from wigan depot fittings to be collected from worsley depot (pre palleted up as per fittings list on drawings).
Start: April 2026
Duration: Ongoing
Rate: Dependent on roles enquire for more information
View more
View less