$31.47/hour2nd Shift: 3:20 p.m. 11:40 p.m. will train on 1st shift for 90-days or shorterSummaryPrimary Function: Prepare associated paperwork including nameplates de-trash perform associated manual and machining operations subassembly final assembly test and button-up of Pump Motor Package (PMP) units large designated Skydrol units and other designated high-volume pump families.Working Procedures- De-trash the kit from the stockroom perform floor stock maintenance cycle count floor stock initiate short requisitions and over-issue tickets.
- Perform all subassembly operations; machines and tools included and are not limited to lathe presses flat lap polish drill press plating potting & adhesive and electrical soldering.
- Perform all the final assembly tasks similar to subassembly tasks.
- Performing all test-associated tasks: Set-up test stand set-up product performing the hydraulic test and performing electrical testing (Dielectric & insulation resistance). Create QC-203 test records.
- Button-up: Nameplate application lockwire painting and masking mechanical removing of cosmetic defects and alodining.
- Works with minimum supervision.
- Sets up and prepares work areas.
- Is able to perform tasks in other work areas.
- Works from complex blueprints and assembly processes. Can utilize personal computers to obtain proper documentation (paperless operation).
- Maintains good working order for tools jigs inspection devices and other supplies and performs simple equipment repairs as necessary.
- Production output shall meet or exceed established standards and shall conform to prescribed quality.
- Trains fellow employees as required.
- Participates in continuous improvement activities/efforts with the classification/ department.
$31.47/hour2nd Shift: 3:20 p.m. 11:40 p.m. will train on 1st shift for 90-days or shorterSummaryPrimary Function: Prepare associated paperwork including nameplates de-trash perform associated manual and machining operations subassembly final assembly test and button-up of Pump Motor Package (PMP) u...
$31.47/hour2nd Shift: 3:20 p.m. 11:40 p.m. will train on 1st shift for 90-days or shorterSummaryPrimary Function: Prepare associated paperwork including nameplates de-trash perform associated manual and machining operations subassembly final assembly test and button-up of Pump Motor Package (PMP) units large designated Skydrol units and other designated high-volume pump families.Working Procedures- De-trash the kit from the stockroom perform floor stock maintenance cycle count floor stock initiate short requisitions and over-issue tickets.
- Perform all subassembly operations; machines and tools included and are not limited to lathe presses flat lap polish drill press plating potting & adhesive and electrical soldering.
- Perform all the final assembly tasks similar to subassembly tasks.
- Performing all test-associated tasks: Set-up test stand set-up product performing the hydraulic test and performing electrical testing (Dielectric & insulation resistance). Create QC-203 test records.
- Button-up: Nameplate application lockwire painting and masking mechanical removing of cosmetic defects and alodining.
- Works with minimum supervision.
- Sets up and prepares work areas.
- Is able to perform tasks in other work areas.
- Works from complex blueprints and assembly processes. Can utilize personal computers to obtain proper documentation (paperless operation).
- Maintains good working order for tools jigs inspection devices and other supplies and performs simple equipment repairs as necessary.
- Production output shall meet or exceed established standards and shall conform to prescribed quality.
- Trains fellow employees as required.
- Participates in continuous improvement activities/efforts with the classification/ department.
View more
View less