drjobs Industrial Piping Project Manager

Industrial Piping Project Manager

Employer Active

1 Vacancy
drjobs

Job Alert

You will be updated with latest job alerts via email
Valid email field required
Send jobs
Send me jobs like this
drjobs

Job Alert

You will be updated with latest job alerts via email

Valid email field required
Send jobs
Job Location drjobs

Raleigh, NC - USA

Monthly Salary drjobs

Not Disclosed

drjobs

Salary Not Disclosed

Vacancy

1 Vacancy

Job Description

Job Title: Commercial/Industrial Piping Project Manager / Field Construction Manager

Department: Commercial Construction

Reports to: VP of Construction Operations

Summary of Position:

Manage plan implement and monitor the construction projects progress to ensure HVAC and process piping systems are installed in accordance with plans and specifications. Support field crews to make sure they are adequately supplied with materials on a timely basis to maintain productivity. Coordinate with field supervisors and other PMs to man projects with appropriate field forces to maintain internal and customer schedules. Ensure project delivered is an above average installation from a quality standpoint that is a properly operating system on time and within budget while maintaining a high level of professionalism and customer satisfaction.

Take ownership of the project that is assigned from start to finish including warranty period. Develop a plan to take the project from start to finish in a manner that meets the required schedule and budget. Execute the plan and make modifications as necessary to stay on schedule and on budget.

Working on multiple projects simultaneously will be required and expected.

Note that this position will spend a significant amount of time in the field visiting job sites and supervising piping installations. The expectation will be that 75% or more time will be spent in the field.

Essential Responsibilities and Job Duties:

Communicate regularly with the project executive in charge of the project. Notify the project executive of any issues early so they will be aware of problems associated with the project. Notify the project executive of any changes in the work early so potential change orders can be identified. Keep the project executive in the loop weekly regarding the projects that are assigned.

Quantify order and purchase miscellaneous piping materials as required to complete project on schedule and within budget.

Verify that all current plans specifications submittals shop drawings and installation instructions are accurate and are effectively utilized by field crews.

Prepare and assemble shop drawings and submittals not handled by the project executive.

Attend scheduled job meetings and notify superintendent foremen or mechanic of status of work and schedule changes.

Schedule equipment and material deliveries with superintendents foremen mechanics suppliers and warehouse.

Prepare and initiate correspondence with customers other trades vendors suppliers subcontractors engineers and architects.

Document job delays and issues (in writing or by email) with project manager and/or customer and project executive.

Notify project executive of potential change order and assist with change order requests as needed.

Assist project executive with progress billings based on status of work completed.

Perform special projects directly with customers and manage complete installation.

Prepare change orders for special projects when working directly with customers.

Thoroughly review weekly job cost and discuss specific cost items with field crews.

Monitor labor cost to meet estimate.

Monitor material cost to meet estimate.

Provide written explanation when actual job cost deviates from estimated job cost.

Review installation instructions for equipment and verify piping near equipment is according to manufacturers instructions.

Review preliminary coordination drawings and recommend revisions prior to distribution to the field. Notify the coordination department of construction schedule and communicate requirements of when coordination drawings are needed for sheet metal and piping needs.

Assist with the development of field crews with training that is desired and/or required.

Assist with recruitment and retention of field crews.

Verify that adequate piping field force is maintained on construction projects.

Assist in scheduling pipe fabrication activities for ship dates to sites and verify deliveries are received as required for field forces.

Coordinate project needs to maintain piping labor productivity.

Assist superintendent foremen or mechanic with labor projections and scheduling.

Assist with safety policies and confirm with field supervisor and superintendents that safety policies are adhered to.

Request assistance from safety manager when questions regarding safety become apparent on jobsites.

Manage the job site conditions and crews to ensure field productivity.

Manage superintendents foremen and mechanics with work sequence and needs.

Prepare a twoweek look ahead schedule for all projects with durations of eight weeks or longer. Update two week look ahead schedule weekly. Note that this is to be performed weekly by the PM with the field crews at the job site.

Update labor loading forecast spreadsheet monthly.

Provide assistance on site when needed to verify proper installation of equipment.

Walk projects weekly to verify installation is of top quality and is according to plans specifications and manufacturers installation instructions for equipment.

Prepare in house punch list for deficiencies noted during weekly walk through and turn over to superintendent foreman or mechanic in charge of project for correction. Verify in house punch list has been completed prior to completion of the project.

Track rental equipment and monitor use on jobsites.

Schedule subcontractors and monitor performance on jobsite.

Assist construction administrative staff as required to complete final closeout documents such as test and balance reports O&M manuals and any other turnover documents

required. Verify asbuilts are maintained during the project and provided to administrative staff prior to close out.

Interact with field supervisor superintendents and foremen to perform annual evaluations of the employees. This will include performance assessment identification of career goals and help the employee achieve their potential career goals.

Stay involved with the project through startup commissioning and turnover and address any punch list or deficiency items during this process.

Maintain connection with customer during the warranty period and be the first point of contact during that time.

Perform pipe takeoffs and place material orders to support field crew operations.

Required Skills and Qualifications:

Technical knowledge of HVAC hydronic piping and hydronic equipment and installation.

Technical understanding of hot water chilled water condenser water steam steam condensate makeup domestic and geothermal piping systems including proper installation.

Technical understanding of pipe valves and fittings associated with different type piping systems for HVAC and process piping installations such as steel ductile iron copper PVC polypropylene preinsulated and stainless steel including proper installation.

Technical understanding of different type connections for piping systems including butt weld socket weld threaded soft solder brazing press grooved slip compression etc. including proper installation.

Understanding of state code requirements for piping installation.

Ability to communicate support and work closely with coworkers.

Ability to communicate and work closely with construction personnel architects engineers and customers.

Good written and oral communication skills.

Good knowledge of management procedures.

Proficient in the use of Microsoft Excel Word and Outlook.

25 years of HVAC commercial construction experience in a project management role directly related to piping installation. 5 years preferred. Or 5 plus years related experience with direct handson experience with installation of piping installation for HVAC and process piping systems.

Physical Requirements:

Ability to perform additional physical activities that require considerable use of limbs and appendages such as climbing lifting reaching above shoulders balancing walking stooping and kneeling. Ability to lift move and handle 80lbs tools or materials. Ability to climb and work from ladders aerial lifts or scaffolding. Ability to work in tight spaces or uneven terrain. Ability

to work in environmental conditions that range from working outdoors during all seasons indoor office environments and utility plants.

Note that job description can be modified at any time by management and may not be inclusive of all responsibilities for this position.

#newcomb

#LIOnsite

#LIEL1


Required Experience:

IC

Employment Type

Full-Time

Company Industry

Department / Functional Area

Engineering

About Company

Report This Job
Disclaimer: Drjobpro.com is only a platform that connects job seekers and employers. Applicants are advised to conduct their own independent research into the credentials of the prospective employer.We always make certain that our clients do not endorse any request for money payments, thus we advise against sharing any personal or bank-related information with any third party. If you suspect fraud or malpractice, please contact us via contact us page.