You will be updated with latest job alerts via emailTo execute monitor operate the WHR Plant Project.
To organise smooth commissioning and handover of the WHR power plant
To provide uninterrupted power supply to main plant after commissioning of WHR Plant.
To plan organise coordinate and monitor for of Electrical maintenance activities related to WHR power generation.
To maximise plant availability improving productivity and minimising maintenance cost without compromising on environment health and safety in the department of Maintenance of WHR power plant.
Ensuring Zero Accident in E&I Department during and running of Power Project.
Please go through above job description thoroughly and share your basic details only if your profile is relevant to position requirement this will help us to screen your candidature:Click here to share some basic details
Work Location: Rawan Cement Works
No Accommodation is available in Township
Job Band: 11
Designation: Officer / Engineer / Senior Officer / Senior Engineer / Assistant Manager
Education: BE /B.Tech /Diploma in Electronics & Instrumentation
Minium Experience Required: 38 Years
Skills Required: Knowledge of Siemens SPPA T3000 DCS FLS DCS ABB 800XA ABB Symphony Plus DCS Allenbradley PLC Siemens PLC system backup System restoration logic checking work. Knowledge wood ward governing system Knowledge of CAPEX proposals and executing CAPEX projects Team working and Presentation skill.
Job Context & Major Challenges
Job Context:
UltraTech Cement Ltd. is the largest manufacturer of grey cement Ready Mix Concrete (RMC) and white cement in India. It is also one of the leading cement producers globally. The company has a consolidated capacity of 132.45 Million Tones Per Annum (MTPA) of grey cement. UltraTech Cement has 23 integrated plants 1 Clinkerization plant 27 grinding units and 7 bulk terminals post the Century merger. Its operations span across India UAE Bahrain Bangladesh and Sri Lanka.
UltraTech Rawan Cement plant started its Line 1 operation in early 90s with the capacity of 1 MTPA commissioned in March 1995 as Grasim Cement Unit. This was setup to capture the Eastern Cluster deficit market. In March2013 Line 2 Clinkerization unit was commissioned along with clinker bulk loading facility currently consolidated capacity of Rawan Cement is 6.5 MTPA. Rawan Cement Works also has Captive Thermal Power Plant with a total capacity of 55 MW Waste Heat Recovery System with capacity of 20.4 MW and 10.8 MW Solar Power Plant. The plant has a state of art technology viz. Vertical Roller Mills from Loesch Germany for grinding limestone and coal Kiln and cooler from L&T/FLS Denmark CombiGrinding Cement Mill with Roller Press from KHD Germany Finish Grinding Slag Grinding Roller Press from Krupp Polysius Germany Cross belt analyser from Gamma Metrics USA for online analysis of Limestone XRay analyser Cem Scanner from FLS Denmark.
As the largest cement producer in India we continually strive to play a key role in finding effective and responsible ways to preserve the environment a Cement Sustainability Initiative. We as a company are committed to improving our sustainability footprint in the identified areas of waste management energy reduction water conservation biodiversity management afforestation and emission reduction which are relevant to the cement industry.
Major Challenges:
To reduce Breakdowns and motor burning for improving plant availability.
Develop a skilled maintenance team to achieve the above goals.
Safe & zero Accident / Incident during WHR project
Required Experience:
Senior IC