drjobs TPP WHRS Instruments EngineerSr Engineer

TPP WHRS Instruments EngineerSr Engineer

Employer Active

1 Vacancy
drjobs

Job Alert

You will be updated with latest job alerts via email
Valid email field required
Send jobs
Send me jobs like this
drjobs

Job Alert

You will be updated with latest job alerts via email

Valid email field required
Send jobs
Job Location drjobs

Raipur - India

Monthly Salary drjobs

Not Disclosed

drjobs

Salary Not Disclosed

Vacancy

1 Vacancy

Job Description

Job Purpose

To execute monitor operate the WHR Plant Project.
To organise smooth commissioning and handover of the WHR power plant
To provide uninterrupted power supply to main plant after commissioning of WHR Plant.
To plan organise coordinate and monitor for of Electrical maintenance activities related to WHR power generation.
To maximise plant availability improving productivity and minimising maintenance cost without compromising on environment health and safety in the department of Maintenance of WHR power plant.
Ensuring Zero Accident in E&I Department during and running of Power Project.

Please go through above job description thoroughly and share your basic details only if your profile is relevant to position requirement this will help us to screen your candidature:Click here to share some basic details

Work Location: Rawan Cement Works

No Accommodation is available in Township

Job Band: 11

Designation: Officer / Engineer / Senior Officer / Senior Engineer / Assistant Manager

Education: BE /B.Tech /Diploma in Electronics & Instrumentation

Minium Experience Required: 38 Years


Skills Required: Knowledge of Siemens SPPA T3000 DCS FLS DCS ABB 800XA ABB Symphony Plus DCS Allenbradley PLC Siemens PLC system backup System restoration logic checking work. Knowledge wood ward governing system Knowledge of CAPEX proposals and executing CAPEX projects Team working and Presentation skill.

Job Context & Major Challenges


Job Context:
UltraTech Cement Ltd. is the largest manufacturer of grey cement Ready Mix Concrete (RMC) and white cement in India. It is also one of the leading cement producers globally. The company has a consolidated capacity of 132.45 Million Tones Per Annum (MTPA) of grey cement. UltraTech Cement has 23 integrated plants 1 Clinkerization plant 27 grinding units and 7 bulk terminals post the Century merger. Its operations span across India UAE Bahrain Bangladesh and Sri Lanka.
UltraTech Rawan Cement plant started its Line 1 operation in early 90s with the capacity of 1 MTPA commissioned in March 1995 as Grasim Cement Unit. This was setup to capture the Eastern Cluster deficit market. In March2013 Line 2 Clinkerization unit was commissioned along with clinker bulk loading facility currently consolidated capacity of Rawan Cement is 6.5 MTPA. Rawan Cement Works also has Captive Thermal Power Plant with a total capacity of 55 MW Waste Heat Recovery System with capacity of 20.4 MW and 10.8 MW Solar Power Plant. The plant has a state of art technology viz. Vertical Roller Mills from Loesch Germany for grinding limestone and coal Kiln and cooler from L&T/FLS Denmark CombiGrinding Cement Mill with Roller Press from KHD Germany Finish Grinding Slag Grinding Roller Press from Krupp Polysius Germany Cross belt analyser from Gamma Metrics USA for online analysis of Limestone XRay analyser Cem Scanner from FLS Denmark.
As the largest cement producer in India we continually strive to play a key role in finding effective and responsible ways to preserve the environment a Cement Sustainability Initiative. We as a company are committed to improving our sustainability footprint in the identified areas of waste management energy reduction water conservation biodiversity management afforestation and emission reduction which are relevant to the cement industry.
Major Challenges:
To reduce Breakdowns and motor burning for improving plant availability.
Develop a skilled maintenance team to achieve the above goals.
Safe & zero Accident / Incident during WHR project

Key Result Areas


KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)KRA11. Organizing condition monitoring/ testing.
Planning / scheduling of periodic and major maintenance / overhauling workContinuous followup with the EPC coordinator for timely availability of materials and manpower at site.
Continuous review of the Project schedules activities and action taken to remove the huddles.
Regular meeting with EPC team for an effective and progressive project schedule.KRA22. Having knowledge and trouble shooting of HT & LT breaker Turbine synchronization Generator protection AVRVVFD To assist other department to carry out break down Ensures break down if any are attended immediately without much of generation loss.Preparing Pre Start Check Charts and formats before Trial runs.
Communicating and follow up with EPC for rectifying the entire defect list.
Developing a commissioning Team for certifying the commissioning activitiesKRA33. To maintain all the operational parameters within the limit maintaining environment and safety standards.Effective & continuous internal & external training to sub ordinates.
Regular departmental meeting to know the requirements of subordinates.KRA44. Continuous monitoring of plant process parameters to minimise breakdown.Compelling the EPC contractor to issue & ensure use of PPE for the working people at project.
Arranging PPE & all required tools / tackles to the WHR Plant staff.
Ensure proper adherence of safety norms.
Finding and elimination of Safety hazards in the Electrical activities.KRA55. Effective operation of Plant & Equipments. Plan organize & coordinate of operational activities of Thermal Power Plant.Monitoring the behavior of equipments.
Plant round & observations.
Analyzing breakdowns & planning for Corrective action.
Planning & organizing AMC/ Maintenance plans.
Organizing condition monitoring/ testing.
Planning / scheduling of periodic and major maintenance / overhauling work..
Having knowledge and trouble shooting of HT & LT breaker Turbine synchronization Generator protection AVRVVFD To assist other department to carry out break down Ensures break down if any are attended immediately without much of generation lossKRA66. Project/Capex related to section.
KRA77. People management To develop the subordinates skill & knowledge for efficient & smooth operation.
KRA88. Inventory Management.
KRA99. Safety Zero accidents in the area of TPP Electrical.

Required Experience:

Senior IC

Employment Type

Full Time

About Company

Report This Job
Disclaimer: Drjobpro.com is only a platform that connects job seekers and employers. Applicants are advised to conduct their own independent research into the credentials of the prospective employer.We always make certain that our clients do not endorse any request for money payments, thus we advise against sharing any personal or bank-related information with any third party. If you suspect fraud or malpractice, please contact us via contact us page.