Major Role: To get BCC (Building Completion Certificate) for 6 substations with ADCI.
PHASE VII:
AWS 220 :
- UPDA Engineer to stamp the as-built drawings.
- New municipality comment from 11 of May to be checked by ADCI all doc will be shared.
ANS :
- UPDA Engineer to stamp the as-built drawings.
- Commercial certificate of the concrete laboratory for ABB & L&T.
DUKHAN ROAD :
- UPDA Engineer to stamp the as-built drawings.
- ADCI to call for QCDD inspection after Eid
RAYYAN VILLAGE:
DOHA CENTRAL :
- UPDA Engineer to stamp the as-built drawings.
- Letter to be provide by ABB to confirm no other modification added on substation.
NEW HITMI :
- KM to provide another letter for the boundary wall
- ABB-UPDA Engineer to stamp the as-built drawings.
AWS 400 :
- UPDA Engineer to stamp the as-built drawings.
- ADCI to call for QCDD inspection after Eid
Requirements
- We are looking for lump-sum offer by substations (sites visit as-built approbation municipality visit with our consultant to submit the file) Job can be considered completed after Municipality approbation.
- Tentative start date June 25 2025.
We are looking for lump-sum offer by substations (sites visit, as-built approbation, municipality visit with our consultant to submit the file) Job can be considered completed after Municipality approbation. Tentative start date? June 25, 2025.